Reference Specifications for Civil Engineering Work 2001



Yüklə 73,69 Kb.
səhifə9/32
tarix26.12.2016
ölçüsü73,69 Kb.
#3343
1   ...   5   6   7   8   9   10   11   12   ...   32

3.5Existing Services


Approval: Obtain approval from service owner to undertake excavation in the vicinity of their services.

Marking: Before commencing ground works, locate, mark and identify existing underground services in the areas that will be affected by the earthworks operations. Hand excavation of trial holes may be necessary to determine the alignment and depth of services prior to excavating with machinery.

Protection: Protect existing services from damage during the works.

Completion: Prior to completion of surface reinstatement, remove any temporary marks (eg paint) used to locate, mark and identify underground services.



Yüklə 73,69 Kb.

Dostları ilə paylaş:
1   ...   5   6   7   8   9   10   11   12   ...   32




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin