J5 and Bungalbin East Iron Ore Proposal Response to Submissions – Appendix j 2015 Rehabilitation Monitoring Report



Yüklə 0.96 Mb.
Pdf просмотр
səhifə1/9
tarix06.09.2017
ölçüsü0.96 Mb.
  1   2   3   4   5   6   7   8   9

 

J5 and Bungalbin East Iron Ore Proposal 

Response to Submissions – Appendix J 

2015 Rehabilitation Monitoring Report 

 

 

 



 

 

 



 

 

 



 

 

Carina Mine Rehabilitation Monitoring  



Baseline 2015 

 

 



 

 

 



 

 


 

 

 



This page has been left blank intentionally. 

 


Carina Mine Rehabilitation Monitoring  

Baseline 2015 

 

 

 



 

 

i



 

 

 



 

 

 



Document status 

Ecologia reference: 1664 

Rev 

Author 

Reviewer 

Approved for issue 

Name 

Distributed to 

Date 

M Hay and S Collins 



M Macdonald 

S Grein 


S Grein 

S Kinsey 

22/12/2015 

 

 



Reproduction of this report in whole or in part by electronic, mechanical or chemical means including 

photocopying,  recording  or  by  any  information  storage  and  retrieval  system,  in  any  language,  is 

strictly prohibited without the express approval of Polaris Metals Pty Ltd and/or Soilwater Group and 

ecologia Environment. 

 

Restrictions on Use 

This  report  has  been  prepared  specifically  for  Polaris  Metals  Pty  Ltd.  Neither  the  report  nor  its 

contents may be referred to or quoted in any statement, study, report, application, prospectus, loan, 

or  other  agreement  document,  without  the  express  approval  of  Polaris  Metals  Pty  Ltd  and/or 

Soilwater Group and ecologia Environment. 

 

ecologia Environment 

1/224 Lord Street 

PERTH WA 6000 

Phone:  08 6168 7200 

Email:  admin@ecologia.com.au 

 

Soilwater Group 



45 Gladstone Street 

PERTH WA 6000 

Phone: 08 9228 3060 

Email: admin@soilwatergroup.com 

 


Carina Mine Rehabilitation Monitoring  

Baseline 2015 

 

 

 



 

 

ii



TABLE OF CONTENTS 

EXECUTIVE SUMMARY ...................................................................................................................... V 

1 

INTRODUCTION ................................................................................................................... 1 

1.1 


OBJECTIVES AND SCOPE ....................................................................................................... 1 

1.2 


LEGISLATIVE CONTEXT ......................................................................................................... 3 

1.3 


VEGETATION MAPPING ........................................................................................................ 4 

1.4 


PREVIOUS RECORDS OF INTRODUCED FLORA ....................................................................... 5 

2 

VEGETATION MONITORING METHODOLOGY ...................................................................... 6 

2.1 


MONITORING SITES .............................................................................................................. 6 

2.2 


FIELD PARAMETERS .............................................................................................................. 8 

2.3 


FIELD SURVEY ....................................................................................................................... 9 

3 

LANDFORM STABILITY MONITORING METHODOLOGY...................................................... 14 

3.1 


POINT CLOUDS ................................................................................................................... 14 

3.2 


SURVEY METHODOLOGY .................................................................................................... 15 

3.3 


POINT CLOUD POST PROCESSING ....................................................................................... 16 

4 

RESULTS ............................................................................................................................. 17 

4.1 


FLORA TAXA ....................................................................................................................... 17 

4.2 


DIVERSITY .......................................................................................................................... 19 

4.3 


VEGETATION STRUCTURE, COVER AND DENSITY ................................................................ 21 

4.4 


OVERSTOREY TREE SPECIES ................................................................................................ 23 

4.5 


FLOWERING AND FRUITING SPECIMENS ............................................................................. 24 

4.6 


INTRODUCED FLORA .......................................................................................................... 25 

4.7 


PHOTOGRAPHIC MONITORING SITES ................................................................................. 25 

4.8 


REHABILITATION CONDITION ............................................................................................. 25 

4.9 


LIDAR MONITORING ........................................................................................................... 25 

5 

DISCUSSION ....................................................................................................................... 28 

5.1 


VEGETATION MONITORING ................................................................................................ 28 

5.2 


LANDFORM STABILITY MONITORING.................................................................................. 29 

6 

CONCLUSIONS & RECOMMENDATIONS ............................................................................. 30 

7 

REFERENCES ...................................................................................................................... 31 

TABLES 

Table 1.1 – Vegetation community mapping ....................................................................................... 4 



Carina Mine Rehabilitation Monitoring  

Baseline 2015 

 

 

 



 

 

iii



Table 2.1 – Vegetation condition (Trudgen 1991) ................................................................................ 9 

Table 2.2 – Rehabilitation condition ratings ........................................................................................ 9 

Table 2.3 – Monitoring sites and vegetation community mapping ..................................................... 13 

Table 3.1 – Flora taxa and frequency (number of 2 x 2 m quadrats) .................................................. 16 

Table 4.1 – Flora taxa and frequency (number of 2 x 2 m quadrats) .................................................. 17 

Table 4.2 – Diversity data .................................................................................................................. 19 

Table 4.3 – Vegetation structure, foliage cover and density data ....................................................... 21 

Table 4.4 – Diversity data for overstorey trees .................................................................................. 23 

Table 4.5 – Introduced flora data ...................................................................................................... 25 

FIGURES 

Figure 1.1 – Regional location of the Carina project ............................................................................ 2 

Figure 2.1 – Schematic diagram of a monitoring site (one transect) .................................................... 7 

Figure 2.2 – Schematic diagram of a monitoring site (two transects) ................................................... 7 

Figure 2.3 – Rainfall data recorded at Southern Cross and Kalgoorlie ................................................ 10 

Figure 2.4 – Monitoring sites (north) ................................................................................................. 11 

Figure 2.5 – Monitoring sites (south) ................................................................................................. 12 

Figure 3.1 – Triangulated mesh surface with photo overlay of part of a point cloud .......................... 15 

Figure 4.1 – Mean annual and perennial species richness for rehabilitation and control sites ............ 19 

Figure 4.2 ‐ Mean annual and perennial species richness for sites ..................................................... 20 

Figure 4.3 – SWDI and species evenness scores for rehabilitation and control sites ........................... 20 

Figure 4.4 – Mean cover and density of vegetation at rehabilitation and control sites ....................... 21 

Figure 4.5 – Mean cover of vegetation for each stratum at rehabilitation and control sites ............... 22 

Figure 4.6 – Mean cover of vegetation for each stratum at sites ....................................................... 22 

Figure 4.7 – Mean cover of trees for each stratum at rehabilitation and control sites ........................ 23 

Figure 4.8 – Total cover of trees for each stratum at sites ................................................................. 24 

Figure 4.9 – Percent of individuals flowering and fruiting in the 2 x 2 m quadrats.............................. 24 

Figure 4.10 – Mean perennial vegetation cover at the photographic monitoring sites ....................... 25 

Figure 4.11 – Digital Terrain Models of Eastern Rehabilitation Site .................................................... 26 

Figure 4.12 – Digital Terrain Models of Western Rehabilitation Sitee ................................................ 27 



APPENDICES 

Appendix A  Site Coordinates ............................................................................................................ 32 

Appendix B  Monitoring Site Data ..................................................................................................... 36 

Appendix C  2 x 2 m Quadrat Data .................................................................................................... 42 

Appendix D  Overstorey Quadrat Data .............................................................................................. 53 


Carina Mine Rehabilitation Monitoring  

Baseline 2015 

 

 

 



 

 

iv



Appendix E  Photographic Monitoring Site Data ............................................................................... 55 

Appendix F  Electronic Data .............................................................................................................. 59 

 


Carina Mine Rehabilitation Monitoring  

Baseline 2015 

 

 

 



 

 

v



EXECUTIVE SUMMARY 

Polaris  Metals  Limited  (Polaris)  operates  the  Carina  Iron  Ore  Mine  (Carina),  located  100 km  north‐

east of Southern Cross and 110 km west of Kalgoorlie in the Goldfields region of Western Australia.  

Polaris is  required  to  undertake rehabilitation  monitoring for the  Carina Iron Ore  Mine  that  meets 

the conditions of Ministerial Statement 852 (MS852).  

The  objective  of  this  study  was  to  establish  a  baseline  rehabilitation  monitoring  program, 

incorporating vegetation monitoring and landform stability monitoring. This will be used to evaluate 

the  development  and stability of the rehabilitated  areas, provide feedback for the improvement  of 

rehabilitation techniques, and to assess progress towards long term objectives and the development 

of adequate, achievable and measurable completion criteria. 

The  2015  baseline  vegetation  rehabilitation  monitoring  field  survey  was  conducted  by  Senior 

Botanist  Melissa  Hay  from  18  to  20  November  2015.  Four  rehabilitation,  five  control  and  six 

photographic  monitoring  sites  were  established  and monitored  at  Carina  during  the  2015  baseline 

survey. In addition, six proposed sites at the rehabilitation trial areas have been marked (at the 0 m 

and 5 m marks) for future monitoring. 

Sixty‐seven  vascular  flora  taxa were recorded during the survey, of which 27 were at  rehabilitation 

sites and 47 at control sites. Of these, two were Priority flora taxa: Acacia cylindrica (Priority 3) and 

Grevillea georgeana (Priority 3) and two were introduced species: *Sonchus oleraceus and *Solanum 

hoplopetalum*Sonchus oleraceus was recorded at three rehabilitation sites (SR01, SR02 and SR03); 

and *Solanum hoplopetalum was recorded at one (at SR02). 

The results of this baseline survey reflect the very young age of the rehabilitation. Low flora diversity 

(including  lower  perennial  species  richness  and  evenness),  low  perennial  vegetation  cover,  high 

variation  in  dominant  strata  and  a  low  tree  species  cover  are  all  characteristic  of  a  recently 

rehabilitated area. The total mean species richness for each 2 x 2 m quadrat was the same for control 

and  rehabilitation  sites  (2.7±1.7).  However,  rehabilitation  sites  had  lower  mean  perennial  species 

richness  (2.1±1.6)  and  higher  mean  annual  species  richness  (0.6±0.6)  than  the  controls.  The  SWDI 

and  species  evenness  was  lower  at  rehabilitation  (1.8  and  0.3,  respectively)  than  control  sites  (3.1 

and 0.5,  respectively).  The  mean  perennial  cover  for  each  2  x  2 m  quadrat  was  higher  at  control 

(35.0±33.8)  than  rehabilitation  sites  (11.0±17.7)  and  the  mean  annual  cover  was  higher  at 

rehabilitation (0.5±1.4) than control sites (0). 

Rehabilitation  sites  were  dominated  by  low  shrubs (8.4%) and tussock  grasses  (2.6%),  whereas the 

control  sites  had  a  mix  strata,  including  tall  shrubs  (12.3%),  trees  (10.3%)  and  mid  shrubs  (5.9%). 

Where  the  control  sites  are  fairly  consistent  with  the  different  structural  layers,  the  rehabilitated 

areas  vary  substantially between  sites.  Mean  percentage  tree  cover was less at rehabilitation (0.4) 

than  control  sites  (17.6).  Rehabilitation  sites  contained  no  mature  trees,  with  only  juveniles  and 

seedlings recorded, whereas the control sites were dominated by mature trees. 



 

Carina Mine Rehabilitation Monitoring  

Baseline 2015 

 

 

 



 

 

1



1

 

INTRODUCTION 

Polaris  Metals  Limited  (Polaris)  operates  the  Carina  Iron  Ore  Mine  (Carina),  located  100 km  north‐

east of Southern Cross and 110 km west of Kalgoorlie in the Goldfields region of Western Australia. 

Carina  is  split  into  two  operational  areas  including  a  mine  infrastructure  area  in  the  north  and  a 

crushing and rail siding area in the south, connected by a 48 km haul road (Figure 1.1). 

Polaris  is required  to  undertake rehabilitation  monitoring for  the Carina Iron Ore  Mine  that meets 

the conditions of Ministerial Statement 852 (MS852). Current rehabilitation areas include: 

 



11 ha of borrow pits along the haul road; 

 



25 ha of the 95 ha waste landform, which include a 4 ha completed rehabilitation trial (seeded 

in August 2015); and 

 

3 ha of rehabilitation associated with road infrastructure. 



1.1

 

OBJECTIVES AND SCOPE 

The  objective  of  this  study  was  to  establish  a  baseline  rehabilitation  monitoring  program, 

incorporating vegetation monitoring and landform erosion monitoring. This will be used to evaluate 

the  development  and stability  of the rehabilitated  areas, provide feedback for the improvement of 

rehabilitation techniques, and to assess progress towards long term objectives and the development 

of adequate, achievable and measurable completion criteria. 

 

 


!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

JAURDI



MENZIES

CARBINE


DIEMALS

RIVERINA


JEEDAMYA

BULLFINCH

YELLOWDINE

HUNT RANGE

KING ROCKS

BURRA ROCK

GOONGARRIE

BROAD ARROW

JAURDI HILL

MARVEL LOCH

MOORINE ROCK

MOUNT MARION

MOUNT BURGES

KOOLYANOBBING

WIDGIEMOOLTHA

MOUNT JACKSON

VICTORIA ROCK

MOUNT THIRSTY

MOUNT CARNAGE

MOUNT JACKSON

BUNGALBIN HILL

750000


800000

850000


900000

64

50



00

0

65



00

00

0



65

50

00



0

66

00



00

0

66



50

00

0



67

00

00



0

Coordinate System

Name: GDA 1994 MGA Zone 50

Projection: Transverse Mercator

Datum: GDA 1994



Figure: 1.1

Project ID: 1664

Drawn: MH

Date: 16/12/2015

Regional location of the Carina project

A4

K

0



20

40

Kilometres



Legend

Railway


Roads

Monitoring Site

!

(



Control

!

(



Rehabilitation

!

(



Rehabilitation Proposed

!

(



Photographic Control

!

(



Photographic Rehabilitation

1:1,250,000

Absolute Scale - 

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(



!

(

!



(

!

(





Поделитесь с Вашими друзьями:
  1   2   3   4   5   6   7   8   9


Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2019
rəhbərliyinə müraciət

    Ana səhifə