Katingan peatland restoration and conservation project pdd cover page



Yüklə 220.81 Kb.
PDF просмотр
səhifə1/35
tarix11.08.2017
ölçüsü220.81 Kb.
  1   2   3   4   5   6   7   8   9   ...   35

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
 
KATINGAN PEATLAND RESTORATION AND 
CONSERVATION PROJECT 
 
PDD COVER PAGE 
 
 
1.  Project name:  
 
The Katingan Peatland Restoration and Conservation Project (The Katingan Project)  
 
2. Project location (country, sub-national jurisdictions):  
 
Mendawai, Kamipang, Seranau and Pulau Hanaut sub-districts of Katingan and Kotawaringin Timur 
districts, Central Kalimantan, Republic of Indonesia  
 
3. Project proponent (organization and contact name with email address and phone number):  
 
Organization: PT. Rimba Makmur Utama (PT. RMU)  
Contact name: Dharsono Hartono, Director  
Email: dharsono@ptrmu.com  
Phone: +62 (0)21-2358-4777  
Mobile: +62 (0)816-976-294  
 
4. Auditor (organization and contact name with email address and phone number):  
 
Organization: SCS Global Services  
Contact name: Christie Pollet-Young, Program Director  
Email: CPollet-Young@scsglobalservices.com  
Phone: (510) 452-9093  
 
5. Project start date, GHG accounting period and lifetime:  
 
Project start date: November 1, 2010  
GHG accounting period: November 1, 2010 to October 31, 2070 (60 years)  
Project lifetime: November 1, 2010 to October 31, 2070 (60 years)  
 
6. Whether the document relates to a full validation or a gap validation:  
 
This PDD relates to a full validation. 
 
7. History of CCB status, where appropriate, including issuance date(s) of earlier 
validation/verification statements etc.:  
 
No CCB history, including any prior issuance of validation/verification statements.  
 
8. The edition of the CCB standards being used for this validation:  
 
CCB Standards Third Edition  
 
9. A brief summary of the project’s expected climate, community and biodiversity benefits: 
 
 
The Katingan Project seeks to protect and restore 149,800 hectares of peatland ecosystems, to offer 
local people sustainable sources of income, and to tackle global climate change 

 all based on a solid 
business model. The project area stores vast amounts of CO
2
, and plays a vital role in stabilizing 

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
v3.0 
 
 
 
 

water flows, preventing devastating peat fires, enriching soil nutrients and providing clean water. It is 
rich in biodiversity, being home to large populations of many high conservation value species, 
including some of the world’s most endangered; such as the Bornean Orangutan (
Pongo pygmaeus
and Proboscis Monkey (Nasalis larvatus). It is surrounded by villages for which it supports traditional 
livelihoods including farming, fishing, and non-
timber forest products harvesting. The project’s 
expected CCB benefits include:  
A) Climate benefits  
- Average 7,451,846 tons of GHG emission reductions annually through avoided deforestation and 
forest degradation, prevention of peat drainage and fires  
- Ecological enhancement at the landscape scale through ecosystem restoration  
 
B) Community benefits  
- Improved quality of life and reduced poverty of the project-zone communities through a creation of 
sustainable livelihoods options and economic opportunities  
- Stronger community resilience through increased capacity to cope with socio-ecological risks  
- Enhanced ecosystem services for the overall well-being of the project-zone communities through 
ecosystem restoration  
 
C) Biodiversity benefits  
- Stabilized and healthy populations of faunal and floral species in the project zone by eliminating 
drivers of deforestation and forest degradation  
- Enhanced natural habitats and ecological integrity through ecosystem restoration  
 
10. Which optional Gold Level criteria are being used and a brief description of the attributes 
that enable the project to qualify for each relevant Gold Level:  
 
The Katingan Project seeks to achieve all climate, community and biodiversity Gold Level criteria.  
 
A) Climate Gold Standard  
The Katingan Project provides significant support and benefits to the project-zone communities in 
coping with and adapting to the expected impacts of climate change in coming years. The project aims 
to strengthen community and biodiversity resilience through various project activities, including 
restoration of peat swamp ecosystems and reforestation, climate resilient infrastructural development, 
adjustment and diversification of agroforestry and agricultural practices, capacity building for forest 
management and non-timber forest product development, and the implementation of integrated 
natural disaster prevention and management systems.  
 
B) Community Gold Standard  
The project zone is qualified as a rural area of a high concentration of population living under the 
national poverty line, and the Katingan Project delivers significant well-being benefits to 
smallholders/community members. The project seeks to benefit communities through a variety of 
socio-economic activities which also target the most vulnerable and marginalized community 
members. This includes the poor, women, elderly and the disabled. These programs are designed to 
lift the poorest out of poverty by engaging them in community-based business development such as 
microfinance, women’s empowerme
nt, sustainable agroforestry, renewable energy development, and 
NTFPs. All community programs are designed and implemented through community participation, 
transparent decision-making processes based on mutual trust, and proper management of project 
activities.  
 
C) Biodiverstiy Gold Standard  
The Katingan Project is qualified as a Key Biodiversity Area (KBA), and conserves and protects the 
biodiversity of global significance. The project is expected to generate exceptional biodiversity benefits 
based on multiple achievement of the criteria defined in the CCB Standards Third Edition. This 
includes four species considered critically Endangered, 10 considered Endangered, and 31 species 

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
v3.0 
 
 
 
 

considered Vulnerable. For two of these at least, Orangutan and Proboscis Monkey, the project zone 
is estimated to hold over 5% of the entire global population.  
 
11. Date of completion of this version of the PDD, and version number, as appropriate:  
 
Date: May 11, 2016 
Version: Katingan_PDD_v1.3  
 
12. Expected schedule for verification, if known:  
 
To be scheduled 
 
 
 

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
v3.0 
 
 
 
 

 
 
KATINGAN PEATLAND RESTORATION 
AND CONSERVATION PROJECT 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Title  
Katingan Peatland Restoration and Conservation Project 
Version 
Katingan_ PDD_v1.3 
Date of Issue 
May 11, 2016  
Prepared By 
PT. Rimba Makmur Utama 
Contact  
Address: Menara BCA, Fl. 45, Jl. MH Thamrin No. 1, Jakarta, Indonesia 
Phone: +62 (0)816-976-294 
Email: dharsono@ptrmu.com 
URL: www.katinganproject.com 
 
 

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
v3.0 
 
 
 
 

TABLE OF CONTENTS 
Table of Contents .................................................................................................................................................. 5
 
List of Figures ........................................................................................................................................................ 8
 
List of Tables ......................................................................................................................................................... 8
 
List of Maps.......................................................................................................................................................... 10 
L
ist of Acronyms……………………………………………………………………………………………………………..9
 
1
 
General .......................................................................................................................................................... 14
 
1.1
 
S
UMMARY 
D
ESCRIPTION OF THE 
P
ROJECT
 ........................................................................................................ 14
 
1.1.1
 
Project summary ....................................................................................................................................... 14
 
1.1.2
 
Project objectives (G1.2) ........................................................................................................................... 14
 
1.2
 
P
ROJECT 
L
OCATION
 ........................................................................................................................................ 17
 
1.2.1
 
Project geographic boundaries (G1.3) ...................................................................................................... 17
 
1.2.2
 
Basic physical parameters (G1.3) ............................................................................................................. 18
 
1.3
 
C
ONDITIONS 
P
RIOR TO 
P
ROJECT 
I
NITIATION
 ...................................................................................................... 20
 
1.3.1
 
Historical land use change and conditions in the project zone (G1.3) ...................................................... 20
 
1.3.2
 
Current land use in the project zone (G1.3) .............................................................................................. 22
 
1.3.3
 
Current condition and types of vegetation in the project area (G1.3) ........................................................ 22
 
1.3.4
 
Current carbon stocks (G1.3) .................................................................................................................... 24
 
1.3.5
 
Communities in the project zone (G1.3).................................................................................................... 24
 
1.3.6
 
Land rights and conflict (G1.3, G5.5) ........................................................................................................ 25
 
1.3.7
 
Current biodiversity (G1.3) ........................................................................................................................ 25
 
1.3.8
 
Identification of high conservation values (HCV) (G1.3, G1.7) .................................................................. 26
 
1.4
 
P
ROJECT 
P
ROPONENT 
(G1
 
&
 
G4) .................................................................................................................... 28
 
1.4.1
 
Contact information and roles of the project proponent (G1.1) ................................................................. 28
 
1.4.2
 
Organizational structure (G4.1) ................................................................................................................. 29
 
1.5
 
O
THER 
E
NTITIES 
I
NVOLVED IN THE 
P
ROJECT
 ..................................................................................................... 30
 
1.5.1
 
Implementing and technical partners (G4.2) ............................................................................................. 30
 
1.5.2
 
Key technical skills required for project implementation (G4.2) ................................................................ 31
 
1.6
 
P
ROJECT 
S
TART 
D
ATE 
(G1.9) ......................................................................................................................... 32
 
1.7
 
P
ROJECT 
C
REDITING 
P
ERIOD 
(G1.9) ................................................................................................................ 33
 
2
 
Design ............................................................................................................................................................ 33
 
2.1
 
S
ECTORAL 
S
COPE AND 
P
ROJECT 
T
YPE
 ............................................................................................................. 33
 
2.2
 
P
ROJECT 
A
CTIVITIES 
(G1) ............................................................................................................................... 33
 
2.2.1
 
Project activities (G1.8) ............................................................................................................................. 33
 
2.2.2
 
Lifetime of the project activities ................................................................................................................. 42
 
2.2.3
 
Adaptive management plan ...................................................................................................................... 43
 
2.3
 
M
ANAGEMENT OF 
R
ISKS TO 
P
ROJECT 
B
ENEFITS 
(G1) ........................................................................................ 44
 
2.3.1
 
Non-permanence risk assessment (G1.10) .............................................................................................. 44
 
2.3.2
 
Measures taken to maintain and enhance benefits beyond project lifetime (G1.11) ................................. 44
 
2.3.3
 
Short and long-term risks to climate, community and biodiversity benefits ............................................... 45
 
2.4
 
M
EASURES TO 
M
AINTAIN 
H
IGH 
C
ONSERVATION 
V
ALUES 
(G1.11) ........................................................................ 46
 
2.5
 
P
ROJECT 
F
INANCING 
(G1.12,
 
G4.3) ................................................................................................................ 46
 
2.6
 
E
MPLOYMENT 
O
PPORTUNITIES AND 
W
ORKER 
S
AFETY 
(G3.9,
 
G3.10,
 
G3.11,
 
G3.12)........................................... 46
 
2.6.1
 
Equal employment opportunities (G3.10) .................................................................................................. 47
 
2.6.2
 
Training and capacity building (G3.9) ....................................................................................................... 47
 
2.6.3
 
Worker safety (G3.12)............................................................................................................................... 48
 
2.7
 
S
TAKEHOLDERS 
(G3) ...................................................................................................................................... 48
 
2.7.1
 
Stakeholder identification (G1.5, G1.6) ..................................................................................................... 48
 
2.7.2
 
Free, prior and informed consent (FPIC) (G3.2) ....................................................................................... 49
 
2.7.3
 
Stakeholder consultations and community involvement (G3.4, G3.5, G3.6, G3.7) ................................... 50
 
2.7.4
 
Procedure to publicize project documentation and monitoring plans (G3.1, G3.3, CM4.3, B4.3) ............. 51
 
2.7.5
 
Feedback and grievance redress procedure (G3.8) ................................................................................. 52
 
2.8
 
C
OMMERCIALLY 
S
ENSITIVE 
I
NFORMATION
 .......................................................................................................... 53
 

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
v3.0 
 
 
 
 

3
 
Legal Status .................................................................................................................................................. 53
 
3.1
 
C
OMPLIANCE WITH 
L
AWS
,
 
S
TATUES
,
 
P
ROPERTY 
R
IGHTS AND 
O
THER 
R
EGULATORY 
F
RAMEWORKS 
(G5) ................. 53
 
3.1.1
 
Compliance with laws and regulations (G5.6) ........................................................................................... 53
 
3.1.2
 
Documentation of legal approval (G5.1, G5.2, G5.7, G5.8) ...................................................................... 55
 
3.2
 
E
VIDENCE OF 
R
IGHT OF 
U
SE 
(G5.8) ................................................................................................................. 57
 
3.3
 
E
MISSIONS 
T
RADING 
P
ROGRAMS AND 
O
THER 
B
INDING 
L
IMITS 
(G5.9) .................................................................. 57
 
3.4
 
P
ARTICIPATION UNDER 
O
THER 
GHG
 
P
ROGRAMS 
(G5.9) .................................................................................... 57
 
3.5
 
O
THER 
F
ORMS OF 
E
NVIRONMENTAL 
C
REDIT 
(G5.9) ........................................................................................... 58
 
3.6
 
P
ROJECTS 
R
EJECTED BY 
O
THER 
GHG
 
P
ROGRAMS 
(G5.9) ................................................................................ 58
 
3.7
 
R
ESPECT FOR 
R
IGHTS AND 
N

I
NVOLUNTARY 
R
ELOCATION 
(G5.3) ..................................................................... 58
 
3.8
 
I
LLEGAL 
A
CTIVITIES AND 
P
ROJECT 
B
ENEFITS 
(G5.4) .......................................................................................... 58
 
4
 
Application of Methodology ......................................................................................................................... 58
 
4.1
 
T
ITLE AND 
R
EFERENCE OF 
M
ETHODOLOGY
........................................................................................................ 58
 
4.2
 
A
PPLICABILITY OF 
M
ETHODOLOGY
 .................................................................................................................... 58
 
4.3
 
M
ETHODOLOGY 
D
EVIATIONS
 ............................................................................................................................ 66
 
4.4
 
P
ROJECT 
B
OUNDARY
 ...................................................................................................................................... 66
 
4.4.1
 
Spatial boundary of the project area (G1.4) .............................................................................................. 66
 
4.4.2
 
Temporal boundary (G1.9, CL1) ............................................................................................................... 92
 
4.4.3
 
Carbon pools ............................................................................................................................................ 92
 
4.4.4
 
Sources of GHG emissions ....................................................................................................................... 93
 
4.5
 
B
ASELINE 
S
CENARIO AND 
A
DDITIONALITY 
(G2.1,
 
G2.2) ..................................................................................... 95
 
4.5.1
 
Justification of baseline scenario and additionality ................................................................................... 95
 
4.5.2
 
Description of acacia plantations as the baseline scenario ..................................................................... 102
 
4.5.3
 
Estimated impacts of the baseline scenario on communities and biodiversity ........................................ 105
 
5
 
Quantificaton of GHG Emission Reductions and REmovals .................................................................. 105
 
5.1
 
P
ROJECT 
S
CALE AND 
E
STIMATED 
GHG
 
E
MISSION 
R
EDUCTIONS OR 
R
EMOVALS 
(CL2.2) ..................................... 105
 
5.2
 
L
EAKAGE 
M
ANAGEMENT 
(CL3.2) ................................................................................................................... 106
 
5.3
 
B
ASELINE 
E
MISSIONS 
(CL1) .......................................................................................................................... 106
 
5.3.1
 
General procedures and assumptions .................................................................................................... 106
 
5.3.2
 
Proxy area analysis ................................................................................................................................ 107
 
5.3.3
 
Projection of deforestation under the baseline scenario ......................................................................... 111
 
5.3.4
 
Emission characteristics in the baseline scenario ................................................................................... 114
 
5.3.5
 
Baseline emissions from microbial decompositions of peat, peat burnings and water bodies in 
peatlands
…..
................................................................................................................................................... ..121
 
5.3.6
 
Baseline emissions from deforestation ................................................................................................... 138
 
5.3.7
 
Baseline emissions from ARR activities .................................................................................................. 144
 
5.3.8
 
Significant sources of baseline emissions ............................................................................................... 151
 
5.4
 
P
ROJECT 
E
MISSIONS 
(CL2) ........................................................................................................................... 152
 
5.4.1
 
General procedures and assumptions .................................................................................................... 152
 
5.4.2
 
Emission characteristics in project scenario ........................................................................................... 152
 
5.4.3
 
Project emissions from aboveground biomass due to deforestation and forest degradation .................. 159
 
5.4.4
 
Carbon enhancement from forest growth................................................................................................ 161
 
5.4.5
 
Project emissions from peat and water body .......................................................................................... 163
 
5.4.5. Project emissions from ARR activities ....................................................................................................... 174
 
5.5
 
L
EAKAGE 
(CL3) ............................................................................................................................................ 178
 
5.5.1
 
Estimation of emissions from activity shifting for avoiding planned deforestation and planned degradation 
(LK-ASP) .......................................................................................................................................................... 179
 
5.5.2
 
Estimation of emissions from displacement of pre-project agricultural activities (LK-ARR) .................... 187
 
5.5.3
 
Estimation of emissions from ecological leakage (LK-ECO) ................................................................... 187
 
5.6
 
S
UMMARY OF 
GHG
 
E
MISSION 
R
EDUCTIONS AND 
R
EMOVALS 
(CL2.2) ................................................................ 190
 
5.6.1
 
Uncertainty Analysis ............................................................................................................................... 190
 
5.6.2
 
Total net GHG emission reductions of the REDD project activity ........................................................... 191
 
5.6.3
 
Total net GHG emission reductions of the WRC project activity ............................................................. 192
 
5.6.4
 
Total net GHG removals of the ARR project activity ............................................................................... 194
 

   
PROJECT DESCRIPTION 
VCS Version 3, CCB Standards Third Edition  
 
 
v3.0 
 
 
 
 

5.6.5
 
Calculation of the VCS Non-Permanence Risk Buffer Withholding ......................................................... 196
 
5.6.6
 
Calculation of Verified Carbon Units ....................................................................................................... 199
 
5.7
 
C
LIMATE 
C
HANGE 
A
DAPTATION 
B
ENEFITS
 ....................................................................................................... 201
 
5.7.1
 
Likely regional climate change (GL1.1, GL1.2) ....................................................................................... 201
 
5.7.2
 
Climate change adaptation measures (GL1.3) ....................................................................................... 202
 
  1   2   3   4   5   6   7   8   9   ...   35


Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2016
rəhbərliyinə müraciət

    Ana səhifə