Great Northern Highway  
Muchea to Wubin Upgrade - Stage 2 
 
MAIN ROADS WESTERN AUSTRALIA 
 
Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
Document Number : 
GNH-CN00-EN01-RPT-1000 
Revision : 

Phase : 
Environmental Approvals 
Date : 
05 / 05 / 2017
 
Contract Number : 
CN00-EN01 
Client Contract Number : 
10/13 
 
 
 
Arup Jacobs Joint Venture 
 
Level 11, Durack Centre 
263 Adelaide Terrace 
Perth WA 6000 Australia 
T +61 8 9469 4199 
F +61 8 9469 4488 

 
 
This page intentionally blank 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
ii 
 
Document Control 
Document description 
Project : 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
Document Title : 
Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
Document No. : 
GNH-CN00-EN01-RPT-1000 
Contract Number : 
CN00-EN01 
Client Contract Number : 
10/13 
 
Current Issue 
Revision  Date 

05 May 2017 
 
Prepared by 
Reviewed by 
Reviewed by 
Approved by 
Document Owner 
Project Manager 
Peer Reviewer 
Project Director 
Lisa Boulden 
Todd Jess 
N/A 
Beth Woods 
 
 
 
 
 
Issue summary 
Revision  Date 
Issue description 
Distribution 

01-02-2017 
Draft 
Technical Review / PAG Review 
1a 
9-02-2017 
Draft 
PAG final review 

10-02-2017 
Final 
Issued to DoEE 

21-04-2017 
Revised Draft 
PAG review 

05-05-2017 
Revised Final 
Issued to DoEE 
 
 
 
 
 
 
 
 
 
 

 
 
This page intentionally blank 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
iii 
 
Contents 
Glossary ............................................................................................................................... 15
 
1.
 
Introduction .................................................................................................................... 19
 
1.1
 
Proposal Description ........................................................................................................19
 
2.
 
Predicted  Impacts .......................................................................................................... 24
 
3.
 
Proposed Environmental Offset ................................................................................... 25
 
3.1
 
Background ......................................................................................................................25
 
3.2
 
Proposed Offset for Carnaby’s Black Cockatoo ................................................................26
 
3.3
 
Proposed Offset for Eucalypt Woodlands of the Western Australian Wheatbelt TEC ........28
 
4.
 
Offset Guide Inputs and Justification .......................................................................... 29
 
5.
 
Conclusions ................................................................................................................... 32
 
 
 
 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
iv 
 
Tables 
Table 1-1 : Offset Information Requested under EPBC 2016/7761 ............................................................. 21
 
Table 2-1 : Clearing Requirements for Relevant Protected Matters ........................................................... 24
 
Table 4-1 : Offsets Guide Inputs and Justifications for Carnaby’s Black Cockatoo .................................. 29
 
Table 4-2 : Offsets Guide Inputs and Justifications for Eucalypt Woodlands of the WA Wheatbelt ......... 30
 
 
Figures 
Figure 1-1 : Project Location ........................................................................................................................ 20
 
Figure 3-1 : Offset Site for Carnaby’s Black Cockatoo – Banovich Road, Hill River ................................. 27
 
 
 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 

 
Appendices 
Appendix A. Hill River Offset Property Biological Survey (GHD, 2016)
 
Appendix B. Assessment of Potential Sites for Thelymitra stellata (Phoenix 
Environmental Services, 2016)
 
Appendix C. Completed EPBC Offset Guide
 

 
 
This page intentionally blank 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
15 
 
Glossary 
Abbreviation 
Description 
AADT 
Annual Average Daily Traffic 
AASHTO 
American Association of State Highway and Transportation Officials 
AHA 
Aboriginal Heritage Act 1972 
AHD 
Australian Height Datum 
AHIS 
Aboriginal Heritage Inquiry System 
APHA 
American Public Health Association 
ARI 
Average Recurrence Interval 
ARRB 
Australian Road Research Board 
AS 
Australian Standards 
ASD 
Approach Sight Distance 
ASJV 
Arup Jacobs Joint Venture 
ASRIS 
Australian Soil Resource Information System 
ASS 
Acid Sulfate Soils 
ASST 
Applied Scientific Services and Technology 
ASTM 
American Society for Testing and Materials 
ATLM 
Audio tactile line marking 
ATLS 
Atterberg Limits and linear shrinkage 
AUL 
Auxiliary Left turn treatment 
AUR 
Auxiliary Right turn treatment 
BAL 
Basic Left turn treatment 
BAM Act 
Biosecurity and Agriculture Management Act 2007 
BAR 
Basic Right turn treatment 
BGL 
Below ground level 
BH 
Borehole 
BoM 
Bureau of Meteorology 
CBR 
California Bearing Ratio 
CEMP 
Construction Environmental Management Plan 
Cha 
Chainage 
CHL 
Channelised Left 
CHR 
Channelised Right 
CN 
Contract Number 
CN0X 
Contract XX – [Contract Name] 
CPTED 
Crime prevention through environmental design 
CSIRO 
Commonwealth Scientific and Industrial Research Organisation 
DAA 
Department of Aboriginal Affairs 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
16 
 
Abbreviation 
Description 
DAFWA 
Department of Agriculture and Food WA 
DBYD   
Dial Before You Dig 
DCP 
Dynamic Cone Penetrometer 
DEM 
Digital Elevation Model 
DER   
Department of Environment and Regulation 
DGS 
Digital Ground Survey 
DoEE 
Department of the Environment and Energy 
DoW 
Department of Water 
DSEWPaC 
Department of Sustainability Environment Water Planning and Community 
EIA 
Environmental Impact Assessment 
EMP 
Environmental Management Plan 
EPA 
Environmental Protection Authority 
EP Act 
Environmental Protection Act 1986 
EPBC Act 
Environment Protection and Biodiversity Conservation Act 1999 
ESA   
Environmentally Sensitive Area 
FWD 
Falling Weight Deflectometer 
GDA94 
Geocentric Datum of Australia 1994 
GDE 
Groundwater Dependent Ecosystems 
GIS 
Geographic Information System 
GNH 
Great Northern Highway 
GPS 
Global Positioning System 
ha 
Hectare 
HWL 
High Wide Loads 
IBA 
Important Bird Area 
IBRA 
Interim Biogeographic Regionalisation of Australia 
ICP-OES 
Inductively coupled plasma optical emission spectrometry 
IRIS 
Integrated Road Information System 
IS 
Infrastructure Sustainability 
IUCN 
International Union for Conservation of Nature 
km 
Kilometre  
LGA 
Local Government Authority 
LISC 
Low Impact Screening List (Main Roads WA) 

Metre 
Ma 
Mega-annum (period of 1 million years) 
Main Roads WA 
Main Roads Western Australia 
Ma 
Mega-annum (period of 1 million years) 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
17 
 
Abbreviation 
Description 
MC 
Moisture content 
MDCS 
Maximum dry compressive strength 
MDD 
Maximum Dry Density 
MGA94 
Map Grid of Australia 1994 
MI 
Municipal Inventory 
MNES 
Matters of National Environmental Significance 
mm 
Millimetre 
MMDD 
Maximum Modified Dry Density 
M2W 
Muchea to Wubin 
M2W team 
Muchea to Wubin Integrated Project Team, comprising Main Roads WA and 
industry partners Jacobs and Arup 
NATA 
National Association of Testing Authorities 
NNTT 
National Native Title Tribunal 
NVCP 
Native Vegetation Clearing Permit 
OMC 
Optimum Moisture Content 
OSOM 
Over Size Over Mass 
PAG 
Project Advisory Group 
Parks and Wildlife 
Department of Parks and Wildlife 
PDNH 
Perth to Darwin National Highway 
PDO 
Property Damage Only 
PEC 
Protected Ecological Communities 
PEIA 
Preliminary Environmental Impact Assessment 
Project Area 
Refers to the entire upgrade project. The project area extends 218 km between 
Muchea and Wubin along the GNH. 
PP 
Pavement pit 
PSD 
Particle size distribution 
RAV 
Restricted Access Vehicle  
RCBC 
Reinforced Concrete Box Culvert 
RCP 
Reinforced Concrete Pipe 
Regolith 
Layer of loose material covering the bedrock of the earth and moon, etc, comprising 
soil, sand, rock fragments, volcanic ash, glacial drift etc. 
RISC 
Roadside Impact Severity Calculator  
RIWI 
Rights in Water and Irrigation (Act) 
RRM 
Road Reference Marks 
RRPM 
Retro-reflective Pavement Markers 
RTE 
Road and Traffic Engineering Branch of Main Roads WA 
RTK 
Real Time Kinematic GPS observation method 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
18 
 
Abbreviation 
Description 
SiD 
Safety in Design 
SISD 
Safe Intersection Sight Distance 
SSD 
Stopping Sight Distance 
SLIP 
State Land Information Portal 
SLK 
Straight Line Kilometre 
SPT 
Standard penetration test 
SSM 
State Survey Marks 
STATS 
Specialist Testing and Technical Services 
SWALSC 
South West Aboriginal Land and Sea Council  

Metric tonne 
tc 
Time of concentration 
TEC 
Threatened Ecological Communities 
TP 
Test pit 
USEPA 
United States Environmental Protection Authority 
WA 
Western Australia 
WAOL 
Western Australian Organism List 
WAPC 
Western Australian Planning Commission  
WC Act 
Wildlife Conservation (Act) 
WCLT 
Wide Centreline Treatment 
WoNS 
Weeds of National Significance 
 
 
 

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
19 
 
1.  Introduction 
In 2014 Main Roads Western Australia (Main Roads WA) established the Muchea to Wubin Integrated Project 
Team (M2W Team), comprising Main Roads WA and industry partners Arup and Jacobs (combining to form 
Arup Jacobs Joint Venture, ASJV) to conduct a comprehensive planning review of the full Muchea to Wubin link 
along the Great Northern Highway (GNH). This planning review is a critical component of the Great Northern 
Highway: Muchea to Wubin Upgrade Stage 2, which has been funded with $384.8 million from the Federal and 
State Governments.  
Among the improvements to be considered as part of the planning review were additional passing lanes, 
flattening crests and easing curves, safer roadsides, more rest stops and additional facilities for heavy vehicles. 
The review examined the previous upgrade strategy developed in the 1990s and, having carefully considered 
current requirements for the movement of people and freight, delivered a revised upgrade strategy.  
The M2W team has identified and prioritised construction packages to be delivered over the four-year period 
from 2015/16 to 2018/19. The construction programme includes the currently funded sections Muchea North / 
Chittering (13km), Bindoon South (2km), New Norcia (7kms), Lyons East Road to Pithara (46km, including 
Miling) and Dalwallinu to Wubin realignment (16km) and identifies additional priority packages to be constructed 
as funding becomes available.  
1.1 
Proposal Description 
1.1.1 
Purpose and Location 
Main Roads WA proposes to realign, upgrade and improve the GNH between Straight Line Kilometre (SLK) 147 
and SLK 256.8 (Walebing to Wubin). The project is located in the Wheatbelt region of Western Australia, 
approximately 144 km to 224 km from Perth (Figure 1-1). 
The works will be carried out in a number of discrete locations to address the deficiencies identified along 
specific stretches of the highway. In general, works will be undertaken to improve the horizontal and vertical 
geometry of the road, increase the seal and formation widths, and improve sight distances and clear zones. 
1.1.2 
Proposed Activities 
Construction activities will include: 
 
construction of new carriageway, upgrading of existing carriageway and construction of overtaking lanes; 
 
upgrade of existing and installation of new culverts on the existing (upgraded) GNH and new (realigned) 
carriageway; 
 
installation of safety barriers where required; 
 
realignment of a number of intersections to improve sight distances and access to the GNH; 
 
construction and realignment of private driveways and stock underpasses; 
 
construction of temporary tracks for traffic management during construction; 
 
restitution works to the existing GNH for farming purposes; 
 
removal of redundant pavement; 
 
relocation of services (power, communications and water); and 
 
installation of new road reserve fencing and gates and removal of old, redundant fencing and gates. 
 
 

!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
Great Nor
th
e
rn Hwy
Gre
at E
aste
rn H
wy
Br
an
d H
w
y
M
arm
io
n A
v
Too
dya
y Rd
Great Sout
hern Hwy
Go
om
all
ing
-To
od
ya
y R
d
Bin
do
on
-M
oo
ra
Rd
Calingiri Rd
Ind
ian
Oc
ea
n
Dr
Qu
airading-Y
ork
Rd
No
rth
am
-Yo
rk
Rd
Ca
lin
gir
i-W
on
gan
Hill
s R
d
No
rth
am
-P
ith
ara
Rd
Bibby Rd
M
id
la
nd
s
Rd
BINDOON
CHITTERING
DALWALLINU
MILING
MUCHEA
NEW
NORCIA
PERTH
PITHARA
WALEBING
WUBIN
0
7,400
14,800
Metres
Legend
!
(
Town
Contract 04 - Pithara Alignment
Contract 05 - Miling Bypass Alignment
Contract 06 - Dalwallinu to Wubin Alignment
Contract 07 - Walebing Alignment
GNH Road Centreline (H006)
Freeway / Highway
Major Road
MXD Location: \\Jacobs.com\PERProjects\PBIF\Projects\PB50732\Technical\GIS\ArcMap\Environmental\CN00\GNH-CN00-EN01-GIS-0050-A.mxd
Task No
GNH-1466
Drawing No
Issue
GNH-CN00-EN01-GIS-0050
A
Drawing Status / Other
Draft
Scale at A3
1:640,000
Project
Client
Main Roads Western Australia
Great Northern Highway
Muchea to Wubin Upgrade Stage 2
Date
By
Chkd
Appd
24/04/2017
SR
LB
XX
Figure 1-1: Project Location
Joint Venture Partners:
Arup Pty Ltd
Level 14  Exchange Tower
2 The Esplanade
Perth WA 6000
Tel +61 8 9327 8300 Fax +61 8 9481 1334
www.arup.com
Jacobs Group (Australia) Pty Ltd
Durack Centre, 263 Adelaide Terrace,
Perth WA 6000
Tel +61 8 9469 4400 Fax +61 8 9469 4488
www.jacobs.com
© Main Roads Western Australia
!
°
Data Source: Main Roads WA, Landgate
Coordinate System: GDA 1994 MGA Zone 50
PRELIMINARY PLAN ONLY

Walebing to Wubin | 
EPBC2016/7761 | Environmental Offsets Proposal 
 
 
 
 
Great Northern Highway - Muchea to Wubin Upgrade - Stage 2 
CN00-EN01     10/13     GNH-CN00-EN01-RPT-1000     Rev 
4
 
Walebing to Wubin | EPBC2016/7761 | Environmental Offsets Proposal
 
21 
 
1.1.3 
Legislative Approvals and Assessments 
Applications for environmental approvals for the contract packages subject to this offset proposal have been 
submitted as follows: 
 
Referral under the Environment Protection and Biodiversity Conservation Act 1999 (Cth) (EPBC Act) – 28 
July 2016 (EPBC 2016/7761). The referral was determined to be a controlled action with the controlling 
provisions being threatened species and communities. 
 
Application for a purpose permit to clear native vegetation under Part V of the Environmental Protection Act 
1986 (WA) (EP Act) – 5 September 2016 (CPS 7231/1). 

Каталог: Documents
Documents -> Исследование диагностических моделей по Пону и Коркхаузу
Documents -> 3 пародонтологическая хирургия
Documents -> Hemoglobinin yenidoğanda yapim azliğina bağli anemiler
Documents -> Q ə r a r Azərbaycan Respublikası adından
Documents -> Ubutumire uniib iratumiye abantu, imigwi y'abantu canke amashirahamwe bose bipfuza gushikiriza inkuru hamwe/canke ivyandiko bijanye n'ihonyangwa ry'agateka ka zina muntu hamwe n'ayandi mabi yose vyakozwe I Burundi guhera mu kwezi kwa Ndamukiza
Documents -> Videotherapy Video: Cool Runnings Sixth Grade
Documents -> Guidelines on methods for calculating contributions to dgs
Documents -> Document Outline form monthly ret cont
Documents -> Şİrvan şƏHƏr məRKƏZLƏŞDİRİLMİŞ Kİtabxana sistemi
Documents -> İnsan hüquq müdafiəçilərinin vəziyyəti üzrə Xüsusi Məruzəçi


Поделитесь с Вашими друзьями:
  1   2   3   4   5   6   7   8   9   ...   31


Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2019
rəhbərliyinə müraciət

    Ana səhifə