The Goal: a process of Ongoing Improvement



Yüklə 1,8 Mb.
Pdf görüntüsü
səhifə26/99
tarix28.07.2023
ölçüsü1,8 Mb.
#137768
1   ...   22   23   24   25   26   27   28   29   ...   99
The Goal A Process of Ongoing - Eliyahu Goldratt

non
bottleneck
machine in your plant, no problem. Because, after all, some percentage of a
non-bottleneck’s time 
should 
be idle. So who cares when those people take
their breaks? It’s no big deal. But on a bottleneck? It’s exactly the opposite.’’
He points to the NCX-10 and says, "You have on this machine only so many
hours available for production—what is it . . . 600, 700 hours?’’


"It’s around 585 hours a month,’’ says Ralph.
"Whatever is available, the demand is even greater,’’ says Jonah. "If you lose
one of those hours, or even half of it, you have lost it forever. You cannot
recover it someplace else in the system. Your throughput for the entire plant
will be lower by whatever amount the bottleneck produces in that time. And
that makes an enormously expensive lunch break.’’
"But we have a union to deal with,’’ says Bob.
Jonah says, "So talk to them. They have a stake in this plant. They’re not
stupid. But you have to make them understand.’’
Yeah, I’m thinking; that’s easier said than done. On the other hand...
Jonah is walking around the NCX-10 now, but he’s not just looking at it
alone. He’s looking at other equipment in the plant. He comes back to us.
"You’ve told me this is the only machine of its type in the plant,’’ says Jonah,
"But this is a relatively new machine. Where are the older machines that this
one replaced? Do you still have those?’’
Bob says vaguely, "Well, some of them we do. Some of them we got rid of.
They were practically antiques.’’
"Do you have at least one of each type of the older machines necessary to do
what this X-what-ever-it-is machine does?’’ Jonah asks.
Lou edges in and and says, "Excuse me, but you’re not actually suggesting
we use that old equipment, are you?’’
"If it’s still operational, then yes, I might suggest it,’’ says Jonah.
Lou’s eyes blink.
He says, "Well, I’m not sure what that would do to our cost profile. But I


have to tell you that those old machines are going to be much more expensive
to operate.’’
Jonah says, "We’ll deal with that directly. First, I just want to know if you
have the machines or not.’’
For the answer, we turn to Bob—who chuckles.
"Sorry to disappoint you all,’’ he says, "but we got rid of an entire class of
machine that we’d need to supplement the NCX-10.’’
"Why did we go do a dumb thing like that?’’ I ask.
Bob says, "We needed the floor space for that new pen to hold inventory.’’
I say, "Oh.’’
"It seemed like a good idea at the time,’’ says Stacey.
Moving right along to heat-treat, we gather in front of the furnaces.
The first thing Jonah does is look at the stacks of parts and ask, "Are you sure
all this inventory requires heat-treat?’’
"Oh, absolutely,’’ says Bob.
"There are no alternatives in the processing ahead of this department that
would prevent the need for heat-treat on at least some of these parts?’’ he
asks.
We all look at each other.
"I guess we’d have to consult with engineering,’’ I say. Bob rolls his eyes.
"What’s the matter?’’ I ask.
"Let’s just say our friends in engineering aren’t as responsive as they could


be,’’ says Bob. "They’re not too happy about changing requirements. Their
attitude is usually, ‘Do it this way because we said so.’’’
To Jonah, I say, "I’m afraid he does have a point. Even if we can get them to
cooperate, it might take a month of Sundays for them to approve it.’’
Jonah says, "Okay, let me ask you this: are there vendors in the area who can
heat-treat parts for you?’’
"There are,’’ says Stacey, "but going outside would increase our cost-per-
part.’’
The expression on Jonah’s face says he’s getting a little bored with this
stonewalling. He points at the mountains of parts.
"How much money is represented in that pile?’’ he asks.
Lou says, "I don’t know... maybe ten or fifteen thousand dollars in parts.’’
"No, it isn’t 
thousands
of dollars, not if this is a bottleneck,’’ says Jonah,
"Think again. It’s considerably more.’’
Stacey says, "I can go dig up the records if you like, but the cost won’t be
much more than what Lou said. At the most, I’d guess we’ve got about
twenty thousands dollars in material—’’
"No, no,’’ says Jonah. "I’m not just talking about the cost of materials. How
many products are you going to sell to customers as soon as you can process
this entire pile?’’
The staff and I talk among ourselves for a moment.
"It’s kind of hard to say,’’ says Bob.
"We’re not sure all the parts in that pile would translate into immediate
sales,’’ says Stacey.


"Oh really? You are making your bottlenecks work on parts that will not
contribute to throughput?’’ asks Jonah.
"Well... some of them become spare parts or they go into finished goods
inventory. Eventually it becomes throughput,’’ says Lou.
"Eventually,’’
says Jonah. "And, meanwhile, how big did you say your
backlog of overdue orders is?’’
I explain to him that sometimes we inflate the batch quantities to improve
efficiency.
"Tell me again how this improves your efficiency,’’ says Jonah.
I feel myself starting to turn red with the memory of earlier conversations.
"Okay, never mind that for now,’’ says Jonah. "Let’s concern ourselves
strictly with throughput. I’ll put my question differently: how many products
are you 
unable
to ship because you are missing the parts in that pile?’’
That’s easier to determine because we know what our backlog is. I tell him
how many millions we’ve got in backlog and about what percent of that is
held up on account of bottleneck parts.
"And if you could finish the parts in that pile, you could assemble and ship
the product?’’ he asks.
"Sure, no problem,’’ says Bob.
"And what is the selling price of each unit?’’
"About a thousand dollars a unit on the average,’’ says Lou, "although it
varies, of course.’’
"Then we are not dealing with ten or fifteen or even twenty thousand dollars
here,’’ says Jonah. "Because we are dealing with how many parts in that
pile?’’


"Perhaps, a thousand,’’ says Stacey.
"And each part means you can ship a product?’’
"Generally, yes,’’ she says.
"And each product shipped means a thousand dollars,’’ says Jonah. "A
thousand units times a thousand dollars is how much money?’’
In unison, our faces turn toward the mountain.
"One million dollars,’’ I say with awe.
"On one condition!’’ says Jonah. "That you get these parts in and out of heat-
treat and shipped as a finished product before your customers get tired of
waiting and go elsewhere!’’
He looks at us, his eyes shifting from face to face.
"Can you afford to rule out any possibility,’’ he asks, "especially one that is
as easy to invoke as a change in policy?’’
Everyone is quiet.
"By the way, I’ll tell you more about how to look at the costs in a moment.
But one more thing,’’ says Jonah. "I want to know where you do quality
inspection on bottleneck parts.’’
I explain to him that most inspection is done prior to final assembly.
"Show me,’’ says Jonah.
So we go to an area where we do quality inspections. Jonah asks about
bottleneck parts that we reject. Immediately, Bob points to a pallet stacked
with shiny steel parts. On top of them is a pink sheet of paper, which
indicates rejection by Quality Control, or Q.C. as it’s known. Bob picks up


the job jacket and reads the forms inside.
"I’m not sure what’s wrong with these, but they must be defective for
some reason,’’ says Bob.
Jonah asks, "Did these parts come through a bottleneck?’’
"Yeah, they did,’’ says Bob.
"Do you realize what the rejection by Q.C. has done to you?’’ asks Jonah.
"It means we have to scrap about a hundred parts,’’ says Bob.
"No, think again,’’ says Jonah. "These are 
bottleneck 
Yüklə 1,8 Mb.

Dostları ilə paylaş:
1   ...   22   23   24   25   26   27   28   29   ...   99




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin