3.5 SIMOPS Worksheet and SIMOPS Layout
Discussion and results carried out during SIMOPS assessment workshop, as
per steps described above, were
recorded in dedicated SIMOPS worksheet reported in below Figure 3.
SIMOPS IDENTIFICATION
Id.
No.
Main
Operation
Description
Planned
Date
Main Operation
Hazard
-----------------
Consequence
Involved Area
Concurrent
Operations
Concurrent Operations
Hazard
---------------
Consequence
5. Hydrocarbon Introduction in PP Refrigeration and PP Common Units
[continuation
]
5.6
Hydrocarbon
Introduction in
PE4 Unit-41
05-Oct-14
Hazard: HC Release
-----------
Consequence: Fire /
Explosion
Scenario
Hazard: Low
temperature due to
Propylene
expansion
-----------
Consequence: Frost
bite
Main Piperack EL. 8.2m
-----
PP
Purification Area
-----
PP Refrigeration Area
COMM - Leak
Test
1) Hazard: Hand tools.
Consequence:
personnel injury,
mechanical damage.
2) Hazard: Drop of material from height.
Consequence: personnel injury,
mechanical damage.
3) Hazard:
Unchecked personnel
access.
Consequence: Misoperation, operator
not ready in case of emergency.
4) Hazard: Overpressure.
Consequence: Operator injury /
Mechanical Damage.
5) Hazard:
Release of Nitrogen
Consequence: Operator asphyxiation.
SIMOPS RISK ASSESSMENT
Initial Risk