1. general
This Part specifies the requirements for the construction of paths used for cycling and pedestrians (“Shared Paths”).
The type, configuration and extent of the Shared Path must be in accordance with the Contract Specific Requirements or the drawings. If there is no applicable configuration in the Contract Specific Requirements or the drawings, the configuration specified in this Part must apply.
Documents referenced in this Part are listed below:
DPTI: Guide to Bikeway Pavement Design Construction & Maintenance for South Australia, available from: http://www.dpti.sa.gov.au/contractor_documents/guidelines_and_miscellaneous.
Austroads AGPT04B-14 “Guide to Pavement Technology Part 4B: Asphalt”
Austroads: AP-G88 “Cycling Aspects of Austroads Guides”
AS 2150: Hot mix asphalt - A guide to good practice
In addition to the requirements specified in this Part, the construction of the Shared Path must comply with the recommended practice in DPTI Guide to Bikeway Pavement Design Construction & Maintenance for South Australia.