PART 3 - EXECUTION
3.01 INSPECTION

A. Inspect concrete slab for proper tolerance and dryness reporting any discrepancies in writing to the general contractor.

B. All work to put the concrete slab in acceptable condition shall be the responsibility of the general contractor.

C. Slab shall be broom cleaned by the general contractor.


3.02 INSTALLATION

A. Cover concrete slab with polyethylene lapping edges 6” (150mm) and seal with adhesive or 2” (50mm) duct tape.

B. Place Aero HL panels end-to-end in a brick pattern at right angles to the direction of the finish flooring leaving a ¼” (6mm) gap between panel ends, use construction adhesive and fasten with staples.

C. Secure panels using Action z-clips and ¼” x 1-1/4” (6mm x 32mm) drive pins or TapCons in an alternating pattern at 2’-0“ o.c.. The Action z-retainer must be placed directionally to allow for expansion and contraction.

D. Place solid blocking at all bleacher stack areas and doorways.

E. Machine fasten strip flooring approximately 12” (300mm) o.c. End joints must be properly driven up. Provide adequate expansion as dictated by the average humidity conditions of the area according to the recommendations of the local Action Flooring Systems, LLC. flooring contractor. Allow 2"(50mm) expansion voids at perimeters and all vertical obstructions.



Yüklə 31,53 Kb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin