Agriculture Modernization Project (P158372)
Page 23 of 70
performing implementing agency of all three agricultural WB projects (i.e. LSDP, HDP, and FVREDP). It is also responsible
for implementation of agricultural projects
financed by ADB, IFAD, and JICA. The final details of the
institutional and
implementation arrangements will be provided in the
Project Operations Manual (POM).
B. Results Monitoring and Evaluation Arrangements
60.
The project will support UZAIFSA to develop and implement the M&E system and framework to monitor
progress toward PDO and intermediate indicators. It will comprise both regular quantitative data collection with periodic
qualitative surveys on key thematic areas. The M&E system will be designed in such a way as to link technical and financial
data regarding project implementation, so that it serves to establish a project Management Information System.
61.
UZAIFSA will be responsible for overall M&E of project outputs and impact, as well as the development and
monitoring of annual work plans. A full-time M&E specialist will be appointed for leading the results measurement, with
guidance from WB, and for compiling M&E data for consolidation into project progress reports. M&E system will include
baseline,
mid-term, and end of project surveys and studies to be carried out by independent
specialists that will be
recruited under AMP. Semi-annual joint implementation support missions with representatives from WB and GoU will
ensure compliance with legal covenants and implementation progress. A mid-term review will be undertaken three years
after project effectiveness to review progress and, if necessary, adjust project design. An Implementation Completion
and Results Report will be prepared by GoU and by WB within six months after the project closes to assess achievements.
Dostları ilə paylaş: