Avaya Aura Disaster Recovery Testing Overall Goal: To test fail-over and recovery of the Avaya Aura Platform for disaster recovery



Yüklə 84,18 Kb.
tarix12.02.2017
ölçüsü84,18 Kb.
#8303

logo-lantana-grad-digital.jpg

Avaya Aura Disaster Recovery Testing

Overall Goal: To test fail-over and recovery of the Avaya Aura Platform for disaster recovery.

Pre-Test Confirmation: Perform translation backup on Avaya Aura Communication Manager and System Manager Servers. Verify backup configurations are stored on file server.

Test Point #1: Test Processor Interchange between the Primary and Secondary servers. A “stop -acf” command will be issued to the active server to simulate a server-down scenario, forcing the Secondary server to become ACTIVE.

Test Duration: Approximately 15-25 minutes

Metric 1: What is the actual time to restoral-of-service/down-time for the G430/G450 Media Gateways after the Interchange?

Result 1: No outage

Metric 2: What is the time to restoral-of-service/down-time for the SIP Trunk Connectivity between Avaya Aura Communication Manager and Avaya Aura Session Manager servers?

Result 2: No outage

Metric 3: Are there any connections that are not fully returned into service after the Interchange? Is this an expected or unexpected result?

Result 3: No outage

Metric 4: What is the time to restoral of service/downtime for the adjunct Servers?

AES: No outage MM: No outage

Additional Notes/Comments:

External call testing and internal call testing completed successfully.

Test Point Score: 100

End of Test Point # 1

Test Point #2: Test Processor Failover from the Primary and Secondary servers to the Enterprise Survivable Server (ESS or Survivable-Core) located at the Disaster Recovery location. A “stop -acf” command will be issued to the active server to simulate a server-down scenario, forcing the ESS to become ACTIVE.

Test Duration: Approximately 15-25 minutes

Metric 1: What is the actual time to restoral-of-service/down-time for the G430/G450 Media Gateways after the Failover?

Result 1: Approx 3 min

Metric 2: What is the time to restoral-of-service/down-time for the SIP Trunk Connectivity between Avaya Aura Communication Manager and Avaya Aura Session Manager servers?

Result 2: As soon as MG comes up

Metric 3: Are there any connections that are not fully returned into service after the Survivable Failover? Is this an expected or unexpected result?

Result 3: _____

Metric 4: What is the time to restoral of service/downtime for the adjunct Servers (or n/a)?

AES: _____ MM: _____

Additional Notes/Comments:

System update/modification requirements noted here.

Test Point Score: 40

End of Test Point # 2

Test Point #3: Test Session Manager Failover from the Primary server in the Primary site to the Secondary server in the Disaster Recovery location. The Primary server in the Primary site will require “ifdown eth2” command to simulate network failure for SIP stations and SIP trunks.

Test Duration: Approximately 15-25 minutes

Metric 1: What is the actual time to restoral-of-service/down-time for the SIP users after the Failover?

Result 1: _____

Metric 2: What is the time to restoral-of-service/down-time for the SIP Trunk Connectivity between Avaya Aura Communication Manager and Avaya Aura Session Manager servers?

Result 2: _____

Metric 3: Are there any connections that are not fully returned into service after the Survivable Failover? Is this an expected or unexpected result?

Result 3: _____

Metric 4: Test internal and external call routing. Are there any routing issues? Is this an expected result?

Internal: _____

External: _____

Additional Notes/Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Test Point Score: _____

End of Test Point # 3

Test Point #4: Test Session Border Controller Failover from the Primary server in the Primary site to the Secondary server in the Disaster Recovery location. Internet Telephony Service Provider (ITSP) to engage in failover scenario.

Test Duration: Approximately 15-25 minutes

Metric 1: Test internal and external call routing. Are there any routing issues? Is this an expected result?

Internal: _____

External: _____

Additional Notes/Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Test Point Score: _____

End of Test Point # 4

System Recovery

  1. Perform “start -ac” on Primary Avaya Aura Communication Manager server.

  2. Perform “start -ac” on Secondary Avaya Aura Communication Manager server.

  3. Confirm G430/G450 Media Gateway registrations point to Primary/Secondary servers at the Primary site.

  4. Perform “ifup eth2” on Primary Avaya Aura Session Manager server.

  5. Confirm SIP user and SIP trunks are operational at the Primary site.

  6. (ITSP) Interchange Session Border Controllers back to Primary site as active server.

  7. Perform internal and external test calls to validate system operation.



Additional Notes/Comments: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Overal Failover Score: _____

1700 Tech Centre Parkway, Suite 100, Arlington, Texas 76014 - Sales 1.800.345.4211 Services 1.866.553.2034 www.lantanacom.com


Yüklə 84,18 Kb.

Dostları ilə paylaş:




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin