Printed copies are uncontrolled unless marked otherwise



Yüklə 1,65 Mb.
Pdf görüntüsü
səhifə5/5
tarix24.08.2017
ölçüsü1,65 Mb.
1   2   3   4   5

 

 

 



 

 Main Roads Western Australia                                                                                                                       Page 51 of 63 

 

 



 

 

 



 

   Main Roads Western Australia                                                                                                                       Page 52 of 63 

 

 

 

 

APPENDIX F 

 

WAPC’s Acid Su

lfate Soil Mapping  

 

 

 



 

 

 



 

 

 

 

       

   Main Roads Western Australia                                                                                                                       Page 53 of 63 

 

 Main Roads Western Australia                                                                                                                       Page 54 of 63 

 

 



 

 

 

APPENDIX G 

 

Department of the Environment, Water, Heritage and 

the Arts Database Search  

 

 

 



   Main Roads Western Australia                                                                                                                       Page 55 of 63 

   Main Roads Western Australia                                                                                                                       Page 56 of 63 

   Main Roads Western Australia                                                                                                                       Page 57 of 63 

 

 

 

 

APPENDIX H 

 

Main Roads WA 



 Revegetation Plan for Pastoral 

Areas  

 

 

 

 

 

 

 

 Main Roads Western Australia                                                                                                                       Page 58 of 63 

 

 



 

 

Main Roads WA 



 Revegetation Plan for Pastoral Areas 

 

 

Condition 14(e), CPS 818   

 

Date: 

Unknown. 

Project: 

Unknown. 



Manager: 

Main Roads WA. 



Location and 

size of 

clearing: 

For project areas located within the pastoral / rangelands region north of the 

agricultural area as described in the 

Environmental Protection Authority‟s Position 

Statement No.2. 

Location and 

size of 

revegetation: 

Primarily for areas that were cleared for searching and extracting road building 

materials (e.g. borrow pits, etc.), and other project related temporary clearing

Clearing 

description: 

Machine clearing. 



Revegetation 

description: 

Replacement of topsoil material regeneration. 



Reason for 

revegetation: 

Revegetation of temporary cleared areas, in accordance with condition 14 of clearing 

permit CPS 818. 

Revegetation / 

rehabilitation 

requirements: 

 

Site 



preparation: 

All vegetation will be cleared from the works area and non-weed infested vegetation is 

stockpiled.  Stockpiled vegetation will be placed in a manner that will prevent damage 

to adjacent vegetation by machinery.  Weed infested vegetation will be disposed of at 

an appropriate site and not used for revegetation purposes.  Burning of the cleared 

vegetation will not be permitted. 

Topsoil will be stripped to a maximum depth of 100mm, and will be stored in a weed 

free (as far as possible) area, as close as possible to the area to be rehabilitated.  

Topsoil will be placed in windrows of less than 1.5m in height and reinstated as soon 

as practicable to maintain viability of in-situ seeds.  



Weed control: 

Appropriate weed control will be carried out when weeds are present, both prior to 

topsoil stripping and where weeds become established on or between the stockpiled 

materials.  Weed control will take place prior to the respreading of topsoil to ensure 

weeds are killed and not transported to other areas.  

Control measures include the removal of weeds to an approved dumpsite, or treatment 

of weeds such as by using herbicides mixed in accordance with manufacturer‟s 

instructions and applied by a licensed operator.  Where practicable, weeds will be 

removed prior to or when they are in flower, and prior to seeding.  

All machinery will be cleared of soil build up and vegetative material before entering 

and leaving the site to help minimise the transportation of weeds and their seeds. 

Exposed areas such as bare batters and borrow pits shall be promptly rehabilitated to 

reduce the potential for weed establishment.  Where works are adjacent to good quality 

vegetation, where weeds from within the project area are likely to spread to and result 

in environmental harm to the adjacent area, those weeds will be controlled annually 

until 12 Dec 2010. 



 Main Roads Western Australia                                                                                                                       Page 59 of 63 

 

 



Main Roads WA 



 Revegetation Plan for Pastoral Areas 

 

 

Condition 14(e), CPS 818   

 

Regeneration / 



direct seeding 

/ planting at an 

optimal time: 

The following rehabilitation works are undertaken on areas of disturbed earth requiring 

rehabilitation: 

 

Topsoil is uniformly respread to a typical depth of 100mm over the project area.  In 



project areas where topsoil has not been removed and/or is not available, other 

substrate, such as gravel, may be substituted as a growth medium. 

 

Project areas will be ripped to a minimum depth of 200mm deep with rip lines 



approximately 300mm apart.  Where slopes are present, rip lines shall follow 

natural contours. 

The following rehabilitation works are undertaken at borrow / gravel pits: 

 

Overburden and then topsoil will be uniformly and evenly spread over the disturbed 



areas of the pit.  Depending on the slope of drainage lines within the pit, small 

swales from the topsoil will be formed to reduce erosion velocities and encourage 

the deposition of seeds. 

 

The whole of the existing pit floor, including drainage lines, will be ripped to a depth 



of 300-500mm deep with rip lines between 500-800mm apart (if the material in the 

pit is able to be ripped). 

 

All stockpiled vegetation will be spread along the contour and the pit floor to help 



promote seed deposition and to reduce erosion velocities. 

Vegetation 

establishment 

period: 

The vegetation establishment period is for at least twelve months following the 

completion of the works.  During this period, maintenance and monitoring will be 

undertaken (see below). 



Ongoing 

maintenance 

and 

monitoring: 

After revegetation works, revegetated areas will be inspected annually for a minimum 

of two years to monitor and control weeds and to measure the effectiveness of 

revegetation works. 

When unwanted weed foliage cover exceeds 25% after the initial two year period, 

further actions will be implemented to monitor and control these weeds.  The additional 

monitoring and weed control will be conducted annually until 12 Dec 2010 or until the 

unwanted weed foliage cover falls below 25%, whichever is sooner. 



Monitoring 

commitments: 

Post revegetation site inspections will be carried out annually for a minimum of two 

years to monitor unwanted weeds and measure the effectiveness of revegetation 

works.   Monitoring of sites where unwanted weed foliage cover exceeds 25% after the 

initial two year period will continue annually until 12 Dec 2010 or until the unwanted 

weed foliage cover falls below 25%, whichever is sooner. 

Management 

commitments: 

Undertake annual weed control of unwanted weeds annually until 12 Dec 2010 or until 

the unwanted weed foliage cover falls below 25%, whichever is sooner. 

Agencies 

consulted and 

submissions 

received: 

Nil. 


   Main Roads Western Australia                                                                                                                       Page 60 of 63 

 

 

 

 

APPENDIX I 

 

Vegetation Clearing Assessment Report  

 

 

 

 

 Main Roads Western Australia                                                                                                                       Page 61 of 63 

 

MRWA Vegetation Clearing Assessment Report 

 

This report has been prepared to assist MRWA in addressing condition 7 “Assessment of Clearing 



Impacts” under Clearing Permit CPS 818/3.

 

 



AREA UNDER ASSESSMENT DETAILS 

 

 

Proponent details 

Proponent’s name:

 

MRWA Gascoyne Region 

Contacts: 

Name: Crystelle Evangelista  

 

 

Phone: (08) 9941 0713 

 

 

Fax: (08) 9941 0701 

 

 

Email: crystelle.evangelista@mainroads.wa.gov.au 



Property details 

Property: 

Strategic Material Area 

 North West Coastal Highway 



 SLK 145.6 



Colloquial name: 

 

Area under assessment 



Clearing Area (ha) 

No. Trees 

Method of Clearing 

For the purpose of: 

Site Plan Attached 

The proposed material area is part of a 20 

year strategic plan and will be 

systematically cleared and revegetated in 

relatively small areas (e.g. 1 or 2 ha) as 

material is required.                         

Mechanical 



Road Building 

Materials 

 Yes 

 No 


Avoidance/Minimise clearing 

How have the clearing impacts been minimised? 

Areas for extension have been carefully selected based upon preliminary material investigation.  



BACKGROUND 

This material pit occurs within vegetation association No. 365 which is described as Shrublands; bowgada & jam scrub with 

scattered York gum & red mallee.  According to Native Vegetation Association Data (DEC & DAF) this vegetation 

association is well represented in the region with 93% remaining.  The condition of the vegetation is best described as 

degraded due to the grazing of cattle and previous material extraction.  

 

 



Site Visit Undertaken 

 Yes 


 No 

 

 



Fauna / Flora Survey Undertaken 

 Yes 


 No 

 

Site Report Attached 

 Yes 


 No 

 

 



Fauna / Flora Survey Report Attached 

 Yes 


 No 

 

Site Photos Attached 

 Yes 


 No 

 

 



Other Relevant References Attached 

 Yes 


 No 

 

Vegetation Association 



Clearing Description 

Vegetation Condition 

Comment 

365 


 

Mechanical 

Degraded  

 

ASSESSMENT OF APPLICATION AGAINST CLEARING PRINCIPLES 

 

(a) 



Native vegetation should not be cleared if it comprises a high level of biological 

diversity. 

Comments 

Proposal is at variance to this Principle 

 

The area under application predominantly consists of grasses and a few scattered shrubs. The 

condition of the vegetation is somewhat degraded due to previous material excavation; however priority 

flora species have been identified within the project area. This proposal is therefore at variance with this 

Principle. 

 

Methodology 

Site visit 

 28/07/08 



GIS Databases:  

- Interim Biogeographic Regionalisation of Australia 

  

 



 Main Roads Western Australia                                                                                                                       Page 62 of 63 

 

 



(b)

 

Native vegetation should not be cleared if it comprises the whole or a part of

or is necessary for the maintenance of, a significant habitat for fauna indigenous to 

Western Australia. 

Comments 

Proposal is likely to be at variance to this Principle 

 

The area under application predominantly consists of grasses and a few scattered shrubs. The 

condition of the vegetation is very good to excellent and may represent a significant habitat for fauna. 

However, due to the relatively small clearing area necessary for the pit extensions, it is expected that 

impacts to fauna species will be marginal.  This proposal may be at variance with this Principle. 

 

Methodology 

Site visit -28/07/08 

DEC advice 

 02/05/08 



 

(c) 

Native vegetation should not be cleared if it includes, or is necessary for the 

continued existence of, rare flora. 

Comments 

Proposal is likely to be at variance to this Principle 

 

DEC Threatened Flora Database search was conducted and no rare flora was known to exist within the 

project areas.  

 

Two priority flora species have been identified to occur within the project area and surrounding 



environment. The two priority flora species that were identified were: 

 

Thryptomene ninghanensis (Priority 1)  



 

Philotheca kalbarriensis (Priority 2) 

 

The project is likely to be at variance with c3 of this clearing principle, being: 



c3) Native vegetation should not be cleared if it is necessary for the continued in situ existence of 

significant habitat for priority flora species published by the Department of Environment and 

Conservation. 

 

This proposal is therefore at variance with this Principle. 



 

Methodology 

Site visit -28/07/08

 

GIS Databases: 



- Declared Rare and Priority Flora list 

 DEC  



 

(d) 

Native vegetation should not be cleared if it comprises the whole or a part of, 

or is necessary for the maintenance of a threatened ecological community. 

Comments 

Proposal is not at variance to this Principle 

 

There are no records of Threatened Ecological Communities (TEC‟S) for the area under application. 

This proposal is therefore not at variance with this Principle. 

 

Methodology 

GIS Databases: 

- Threatened Ecological Communities 

 DEC  


 

(e) 

Native vegetation should not be cleared if it is significant as a remnant of 

native vegetation in an area that has been extensively cleared. 

Comments 

Proposal is not at variance to this Principle 

 

Pit 145.6 SLK is representative of Beard Vegetation Association 365 of which 93% of the pre-European 

extent remains. This vegetation association is therefore of „least concern‟ for biodiversity conservation.

 

This proposal is therefore not at variance with this Principle. 



Methodology 

GIS Databases: 

- Interim Biogeographic Reginalisation of Australia 

  



- Pre-European Vegetaion 

 

 



(f) 

Native vegetation should not be cleared if it is growing in, or in association 

with, an environment associated with a watercourse or wetland. 

Comments 

Proposal is not at variance to this Principle 

 

The area under application does not consist of a watercourse or wetland .  

This proposal is therefore not at variance with this Principle. 

 

Methodology 

Site visit -28/07/08 

DEC‟s web based Geographic Data Atlas mapping tool

 

GIS Databaes: 



- Hydrography, linear  

- Hydrographic Catchments 

 Catchments  



 

 


 Main Roads Western Australia                                                                                                                       Page 63 of 63 

 

 



(g) 

Native vegetation should not be cleared if the clearing of the vegetation is likely 

to cause appreciable land degradation. 

Comments 

Proposal is not at variance to this Principle

  

 

The area under application consists of loamy earth soils.  Given the small clearing footprint and that the 

surrounding vegetation is in good to excellent condition (with 93% of pre-European vegetation 

remaining).  The proposal is not at variance with this principle.  

 

Methodology 

Site visit - 28/07/08 

GIS Databases: 

- Acid Sulphate Soil risk map 

 

 

(h) 



Native vegetation should not be cleared if the clearing of the vegetation is likely 

to have an impact on the environmental values of any adjacent or nearby 

conservation area. 

Comments 

Proposal is not at variance to this Principle 

 

The proposed project will not impacts on any conservation areas and therefore is not at variance with 

this Principle. 

 

Methodology 

Site Visit -28/07/08 

DEC‟s web based Geographic Data Atlas mapping tool

 

 

(i) 



Native vegetation should not be cleared if the clearing of the vegetation is likely 

to cause deterioration in the quality of surface or underground water. 

Comments 

Proposal is not at variance to this Principle

  

 

The area under application only receives approximately 300mm of annual rainfall. Due to the low 

rainfall rate, these proposals will not cause deterioration in the quality of surface or under ground water 

and therefore is not a variance to this Principle. 

 

Methodology 

Site Visit - 28/07/08 

DEC‟s web based Geographic Data Atlas mapping tool

 

Rainfall, Mean Annual 



 BOM  


 

 

(j) 



Native vegetation should not be cleared if clearing the vegetation is likely to 

cause, or exacerbate, the incidence or intensity of flooding. 

ASSESSOR’S RECOMMEN

DATIONS 

 

List of Principles seriously at variance, at 



variance or maybe at variance 

Recommendation:  As the proposed project will involve temporary 

clearing, a revegetation management plan is required.   An 

Environmental Management Plan has been included in the PEIA and a 

Flora Surveys will be conducted over the entire project area. 



 

 

OFFICER PREPARING REPORT 

 

Crystelle Evangelista (Environment Officer) 



Gascoyne Regional Office MRWA 

Phone 08 9941 0713 

 

Date: 16/03/09



 

 

 



Comments 

Proposal is not at variance to this Principle

  

 

The soil consists of loamy earth soils. In addition the area under application only receives 

approximately 300mm of annual rainfall. Due to the nature of the soil and the low rainfall rate, these 

proposals will not exacerbate the incidence of flooding and therefore is not at variance with this 

Principle.  

 

Methodology 

Site Visit - 28/07/08 

Rainfall, Mean Annual 



 BOM  


 


Yüklə 1,65 Mb.

Dostları ilə paylaş:
1   2   3   4   5




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2020
rəhbərliyinə müraciət

    Ana səhifə