UNIÓN TEMPORAL – ISMOCOL JOSHI PARKO 
 
 
 
 
2012 UPDATE TO THE 
2010 PALAGUA FIELD ESIA 
 
Environmental and Social Impact of 
a 32-well expansion project  
planned for 2010 
 
 
JULY 2012 
 
 
 
 

 
 
 
 
 
 
 

 
UNION TEMPORAL 
ISMOCOL JOSHI PARKO 
 
2012 UPDATE TO THE 2010 ESIA: 
Environmental and Social Impact 
of a 32-well expansion project 
planned for 2012 
 
PALAGUA FIELD 
Puerto Boyacá, Colombia
 
 
 

 
Table of Contents 
 
EXECUTIVE SUMMARY ............................................................................................................ 1
 
A.
 
DESCRIPTION OF THE PROJECT ...................................................................... 1
 
A.1
 
CHARACTERISTICS OF THE PROJECT ........................................................... 1
 
A.1.1
 
TECHNICAL DESCRIPTION OF THE PROJECT .............................................. 1
 
A.1.2
 
LOCATION OF THE PROJECT ........................................................................... 1
 
B.
 
IDENTIFICATION OF THE HOSTS, OPERATORS AND CONTRACTORS ... 4
 
C.
 
ENVIRONMENTAL CONDITIONS BASE LINE ............................................... 5
 
C.1
 
CLIMATIC ASPECTS ........................................................................................... 6
 
C.2
 
SOIL, GEOLOGY, GEOMORPHOLOGY AND GEOTECHNICS ..................... 6
 
C.3
 
VEGETATION ....................................................................................................... 7
 
C.4
 
USE, DEVELOPMENT AND ALLOCATION OF NATURAL RESOURCES ... 8
 
D.
 
APPLICABLE ENVIRONMENTAL STANDARDS ............................................ 9
 
D.1
 
AIR QUALITY ..................................................................................................... 10
 
D.2
 
WATER QUALITY.............................................................................................. 10
 
D.2.1
 
DRINKING WATER............................................................................................ 10
 
D.2.2
 
SURFACE WATER IN PALAGUA LAKE ........................................................ 11
 
D.2.3
 
UNDERGROUND WATER ................................................................................ 12
 
D.3
 
SOIL QUALITY ................................................................................................... 12
 
D.4
 
NOISE ................................................................................................................... 13
 
E.
 
PROPOSED MITIGATION MEASURES ........................................................... 13
 
E.1
 
GUIDELINES FOR THE EVALUATION AND MANAGEMENT RISK FOR 
OIL AND GAS DEVELOPMENT ....................................................................... 13
 
E.2
 
GENERAL GUIDELINES ON ENV. HEALTH AND SAFETY ....................... 15
 
E.3
 
EMERGENCY AND CONTINGENCY PLAN – GENERAL ............................ 15
 
F.
 
NET ENVIRONMENTAL IMPACT ................................................................... 15
 
F.1
 
PHYSICAL-BIOTIC COMPONENT .................................................................. 16
 
F.2
 
SOCIO-ECONOMIC AND CULTURAL COMPONENT .................................. 16
 
F.3
 
RISK ANALYSIS ................................................................................................. 16
 
CHAPTER 1
 
PRELIMINARY ................................................................................................... 17
 
1.1
 
INTRODUCTION ................................................................................................ 17
 
1.2
 
OBJECTIVES ....................................................................................................... 18
 
1.2.1
 
GENERAL OBJECTIVE...................................................................................... 18
 
1.2.2
 
SPECIFIC OBJECTIVES ..................................................................................... 18
 
1.3
 
JUSTIFICATION AND SCOPE .......................................................................... 19
 
1.4
 
METHODOLOGY ............................................................................................... 19
 
1.4.1
 
GATHERING OF BASIC INFORMATION ....................................................... 19
 
1.4.2
 
SECONDARY BASIC INFORMATION ............................................................ 20
 
1.4.3
 
ANALYSIS OF INFORMATION ........................................................................ 20
 

 
UNION TEMPORAL 
ISMOCOL JOSHI PARKO 
 
2012 UPDATE TO THE 2010 ESIA: 
Environmental and Social Impact 
of a 32-well expansion project 
planned for 2012 
 
PALAGUA FIELD 
Puerto Boyacá, Colombia
 
 
 
ii 
 
1.5
 
BACKGROUND .................................................................................................. 21
 
CHAPTER 2
 
POLITICAL, LEGAL AND MANAGERIAL FRAMEWORK .......................... 22
 
2.1
 
APPLICABLE LAWS AND REGULATIONS (COLOMBIAN) ....................... 22
 
2.2
 
INTERNATIONAL TREATIES AND POLLUTION STANDARDS  ............... 23
 
2.3
 
APPLICABLE ENVIRONMENTAL STANDARDS .......................................... 25
 
CHAPTER 3
 
PROJECT BASELINE ......................................................................................... 26
 
A. 
 
PROJECT AREA DELIMITATION .................................................................... 26
 
A.1
 
LOCATION OF THE PROJECT ......................................................................... 26
 
A.1.1
 
LOCATION OF WELLS TO BE DRILLED ....................................................... 27
 
A.1.2
 
TRANSPORTATION ROUTES .......................................................................... 28
 
A.1.3
 
DESCRIPTION OF THE OPERATIONAL PROCESS ...................................... 29
 
A.2
 
DESCRIPTION OF THE PROJECT .................................................................... 29
 
A.2.1
 
ACCESS ROADS ................................................................................................. 32
 
A.2.2
 
DRILLING LOCATIONS .................................................................................... 32
 
A.2.2.1
 
CONSTRUCTIVE METHODS ............................................................................ 33
 
A.2.2.2  
TEMPORARY FACILITIES................................................................................ 34
 
A.2.2.3
 
EARTHMOVING ................................................................................................. 36
 
A.2.2.4
 
LABOR FORCE REQUIREMENTS ................................................................... 36
 
A.2.2.5
 
EQUIPMENT REQUIREMENTS........................................................................ 36
 
A.2.2.6
 
FINAL DISPOSAL PLACE OF MATERIAL FROM THE DRILLING ............ 37
 
A.2.2.7
 
USE, EXPLOITATION AND EFFECT OF NATURAL RESOURCES ............ 37
 
A.3
 
DRILLING ACTIVITIES, BASIC INFRASTRUCTURE AND EQUIPMENT . 38
 
A.3.1
 
DRILLING EQUIPMENT.................................................................................... 39
 
A.3.1.1
 
GENERAL DRILLING DESIGN OF THE DEVELOPMENT WELLS............. 41
 
A.3.1.2
 
REQUIRED PERSONNEL .................................................................................. 42
 
A.3.1.3
 
EFFECT ON NATURAL RESOURCES ............................................................. 43
 
A.3.2
 
ARTIFICIAL LIFTING SYSTEM ....................................................................... 44
 
A.3.2.1
 
PRODUCTION TESTS ........................................................................................ 46
 
A.4
 
FLOW LINES ....................................................................................................... 46
 
A.4.1
 
PIPE RACKS, STORAGE OF MATERIALS AND WORKSHOPS .................. 47
 
A.4.2
 
LAND MOVEMENTS ......................................................................................... 47
 
A.4.3
 
CONSTRUCTIVE METHODS AND SUPPORT FACILITIES ......................... 47
 
A.4.4
 
LOCATION OF THE RUBBISH DUMPS .......................................................... 47
 
A.4.5
 
USE, IMPACT AND MANAGEMENT OF NATURAL RESOURCES ............ 47
 
A.4.6
 
LABOR FORCE REQUIREMENTS ................................................................... 48
 
A.4.7
 
PUMPING STATIONS AND TRAPS ................................................................. 48
 
A.4.8
 
VALVES TO BE INSTALLED ........................................................................... 48
 
A.5
 
DISMANTLING, ABANDONMENT AND RECUPERATION ........................ 48
 
A.5.1
 
DISMANTLING ................................................................................................... 48
 
A.5.2
 
ABANDONMENT ............................................................................................... 49
 

 
UNION TEMPORAL 
ISMOCOL JOSHI PARKO 
 
2012 UPDATE TO THE 2010 ESIA: 
Environmental and Social Impact 
of a 32-well expansion project 
planned for 2012 
 
PALAGUA FIELD 
Puerto Boyacá, Colombia
 
 
 
iii 
 
A.5.3
 
RECOVERY ......................................................................................................... 49
 
A.5.3.1   
FINAL CLEAN OUT ........................................................................................... 49
 
A.5.3.2 
RECOVERY OF IMPACTED AREAS ............................................................... 49
 
B.
 
PHYSICAL GEOGRAPHY ................................................................................. 50
 
B.1
 
ABIOTIC MEDIUM ............................................................................................. 50
 
B.1.1
 
CLIMATOLOGIC ASPECTS .............................................................................. 52
 
B.1.2
 
HYDROLOGY ..................................................................................................... 64
 
B.1.2.1
 
HYDROGEOLOGY ............................................................................................. 65
 
B.1.3
 
REGIONAL GEOLOGY ...................................................................................... 65
 
B.1.3.1
 
STRATIGRAFY ................................................................................................... 67
 
B.1.3.2
 
STRUCTURAL GEOLOGY ................................................................................ 69
 
B.1.3.3
 
GEOMORPHOLOGY .......................................................................................... 70
 
B.1.3.4
 
GEOTECHNICAL CHARACTERISTICS OF THE ZONE ................................ 70
 
B.1.4
 
SOILS ................................................................................................................... 71
 
B.1.4.1
 
USES OF THE SOIL ............................................................................................ 73
 
B.1.4.2
 
CATTLE USE ....................................................................................................... 74
 
B.1.4.3
 
AGRICULTURAL USE ....................................................................................... 74
 
B.1.4.4
 
INDUSTRIAL USE .............................................................................................. 75
 
B.1.4.5
 
EXPOSED AREAS .............................................................................................. 75
 
B.1.4.6
 
HYDRIC USE ....................................................................................................... 76
 
C.
 
NATURAL THREATS AND RISK ..................................................................... 76
 
D.
 
BIOTIC ENVIRONMENT ................................................................................... 79
 
E.
 
HUMAN ENVIRONMENT ................................................................................. 90
 
F.
 
ENVIRONMENTAL QUALITY OF THE AREA OF THE PROJECT............ 106
 
F.1 
 
AIR QUALITY ................................................................................................... 106
 
F.1.1
 
METHODS AND EQUIPMENT CALIBRATION ........................................... 106
 
F.1.2
 
MEASUREMENT DATES AND LOCATIONS ............................................... 107
 
F.1.3 
 
APPLICABLE REGULATIONS ....................................................................... 109
 
F.1.3.1 
 
AIR QUALITY INDEX (AQI) ........................................................................... 109
 
F.1.3.2 
 
COLOMBIAN AIR QUALITY STANDARDS ................................................. 109
 
F.1.3.3
 
CALCULATION OF LOCAL STANDARDS ................................................... 110
 
F.1.4 
 
MEASUREMENTS DATA ................................................................................ 111
 
F.1.5 
 
ANALYSIS OF MEASUREMENTS ................................................................. 112
 
F.1.5.1 
 
SUSPENDED PARTICULATE MATERIAL (SPM) ........................................ 112
 
F.1.5.2  
GASES ................................................................................................................ 114
 
F.1.5.3  
SUMMARY OF GAS MONITORING .............................................................. 118
 
F.1.5.4  
SUMMARY OF MONITORING THE AIR QUALITY INDEX (AQI) ........... 118
 
F.1.6  
 
CONCLUSIONS FROM THE AIR QUALITY STUDY .................................. 119
 
F.1.7
 
GREENHOUSE GAS EMISSIONS ................................................................... 119
 
F.2
 
WATER QUALITY............................................................................................ 122
 

 
UNION TEMPORAL 
ISMOCOL JOSHI PARKO 
 
2012 UPDATE TO THE 2010 ESIA: 
Environmental and Social Impact 
of a 32-well expansion project 
planned for 2012 
 
PALAGUA FIELD 
Puerto Boyacá, Colombia
 
 
 
iv 
 
F.2.1
 
DRINKABLE WATER ...................................................................................... 122
 
F.2.2
 
SURFACE WATERS OF PALAGUA LAKE ................................................... 122
 
F.2.2.1  
LAKE PALAGUA SURFACE WATER ANALYSIS RESULTS .................... 125
 
F.2.2.2  
ANALYSIS OF SURFACE WATER IN CREEKS OF PALAGUA FIELD .... 131
 
F.2.2.3   
ADDITIONAL SURFACE WATER MONITORING EFFORTS .................... 133
 
F.2.2.4  
ANALYSIS OF SEDIMENTS IN PALAGUA LAKE AND CREEKS ............ 137
 
F.2.3
 
UNDERGROUND WATER TESTING (Shallow, 3-4m deep wells)................ 141
 
F.2.4
 
WASTE WATER MANAGEMENT .................................................................. 148
 
F.2.4.1  
DOMESTIC WASTE WATER .......................................................................... 148
 
F.2.4.2  
INDUSTRIAL WASTE WATER ....................................................................... 148
 
F.2.4.3  
INJECTION PLANT OF RESIDUAL WATER ................................................ 152
 
F.3
 
SOIL QUALITY ................................................................................................. 157
 
F.3.1
 
PRINCIPLES OF BIODEGRADATION OF HYDROCARBONS ................... 157
 
F.3.2
 
TREATMENT UTILIZING THE TECHNOLOGY OF LAND FARMING..... 158
 
F.3.3
 
BIOREMEDIATION TREATMENT ................................................................. 159
 
F.3.3.1
 
BIO NUTRIENTS .............................................................................................. 159
 
F.3.3.2
 
CONDITIONING OF THE MIXTURE ............................................................. 160
 
F.3.3.3
 
PROCESS OF BIO REMEDIATION ................................................................ 160
 
F.3.3.4
 
PREPARATION OF THE MIXTURE OF TREATMENT................................ 160
 
F.3.3.5
 
COMPLETION OF THE BIOREMEDIATION PROCESS .............................. 161
 
F.3.4
 
SOIL SAMPLING FROM THE PALAGUA LANDFARMING AREA........... 162
 
F.3.5
 
SOIL QUALITY RESULTS............................................................................... 163
 
F.4
 
LOWLANDS IN THE PALAGUA FIELD ........................................................ 165
 
F.5
 
NOISE ................................................................................................................. 168
 
F.5.1
 
EVALUATION INDEXES AND NOISE STANDARDS ................................. 168
 
F.5.2
 
FIELD EVALUATION ...................................................................................... 172
 
F.5.3
 
DATA COLLECTION AND RESULTS ........................................................... 173
 
F.5.3.1
 
DAYTIME DATA .............................................................................................. 174
 
F.5.3.2
 
NIGHTTIME DATA .......................................................................................... 177
 
F.5.4
 
DATA ANALYSIS ............................................................................................. 180
 
F.5.5
 
CONCLUSIONS................................................................................................. 180
 
G.
 
ARCHEOLOGICAL, HISTORICAL AND CULTURAL RESOURCES ......... 180
 
G.3
 
PRESENCE OF NATIVE OR AFRICAN-COLOMBIAN COMMUNITIES ... 180
 
CHAPTER 4  POTENTIAL IMPACT ON ENVIRONMENT, HEALTH AND SAFETY ...... 181
 
4.1
 
IMPACT IDENTIFICATION AND EVALUATION ........................................ 181
 
4.2  
ENVIRONMENTAL ASSESSMENT ............................................................... 181
 
4.2.1  
AFFECTED ENVIRONMENT .......................................................................... 181
 
4.2.2   
IDENTIFICATION OF IMPACT ...................................................................... 182
 
4.3   
IMPACT EVALUATION FOR ACTIVITIES TO BE EXECUTED ................ 182
 
4.3.1.   
METHOD OF IMPACT EVALUATION .......................................................... 182
 

 
UNION TEMPORAL 
ISMOCOL JOSHI PARKO 
 
2012 UPDATE TO THE 2010 ESIA: 
Environmental and Social Impact 
of a 32-well expansion project 
planned for 2012 
 
PALAGUA FIELD 
Puerto Boyacá, Colombia
 
 
 

 
4.3.1.1   
IMPACT IDENTIFICATION ............................................................................ 185
 
4.3.1.2
 
IDENTIFYING IMPACT CAUSE-EFFECT FACTORS .................................. 190
 
4.3.1.3
 
QUALITATIVE ASSESSMENT OF ENVIRONMENTAL IMPACT ............. 190
 
4.4   
ENVIRONMENTAL ASSESSMENT WITHOUT THE PROJECT ................. 195
 
4.5   
ASSESSMENT WITH PROJECT ...................................................................... 195
 
4.6  
ENVIRONMENTAL INDICATORS ................................................................. 198
 
4.7   
ENVIRONMENTAL IMPACT SENSITIVITY ANALYSIS............................ 200
 
4.7.1   
EVALUATION RESULTS ................................................................................ 201
 
4.7.1.1   
WITHOUT PROJECT SCENARIO ASSESSMENT ........................................ 201
 
4.8   
RESULTS ANALYSIS WITH PROJECT SCENARIO .................................... 204
 
4.9   
RESULTS OF THE SENSITIVITY ANALYSIS .............................................. 208
 
4.10   
ENVIRONMENTAL INDEXES OR INDICATORS ........................................ 209
 
4.10.1   
ENVIRONMENTAL QUALITY INDEXES (EQI) ........................................... 209
 
4.10.2   
DETERMINATION OF THE (EQI) .................................................................. 210
 
4.11
 
IMPACTS FROM RISKS .................................................................................. 213
 
4.11.2  
IMPACT ASSESSMENT MATRIX .................................................................. 221
 
4.12
 
SOCIAL COMPONENT – SOCIAL MANAGEMENT .................................... 225
 
4.12.1  
SOCIAL MANAGEMENT RESPONSIBILITIES AND ACTIVITIES ........... 226
 
CHAPTER 5
 
ENVIRONMENTAL MANAGEMENT SYSTEM ........................................... 237
 
5.1
 
INTRODUCTION .............................................................................................. 237
 
5.2
 
OBJECTIVES OF THE ENVIRONMENTAL MANAGEMENT PLAN ......... 237
 
5.3
 
ACTIVITIES OF THE EMVIRONMENTAL MANAGEMENT SYSTEM ..... 237
 
5.4
 
ORGANIZATION OF THE EMS ...................................................................... 238
 
5.4.1
 
ORGANIZATIONAL STRUCTURE AND RESPONSIBILITY ...................... 239
 
5.4.2
 
PLANNING ........................................................................................................ 241
 
5.4.3
 
IMPLEMENTATION ......................................................................................... 243
 
5.4.4
 
CONTROL AND FOLLOW UP ........................................................................ 245
 
CHAPTER 6
 
ENVIRONMENTAL MITIGATION AND PREVENTION MEASURES ....... 247
 
6.1
 
INTRODUCTION .............................................................................................. 247
 
6.2
 
ENVIRONMENTAL MITIGATION AND PREVENTION MEASURES ....... 247
 
6.3
 
ORGANIZATION OF THE ENVIRONMENTAL MANAGEMENT .............. 248
 
6.3.1
 
ENVIRONMENTAL INDICATORS ................................................................. 249
 
6.4
 
GENERAL GUIDELINES FOR ENV. HEALTH AND SAFETY ................... 251
 
6.4.1
 
GENERAL GUIDELINES ON SOCIAL MANAGEMENT ............................. 252
 
6.4.1.1
 
Information and Communication Guideline ....................................................... 252
 
6.4.1.2
 
Guideline for Hiring Local Work Force ............................................................. 254
 
6.4.1.3
 
Guidelines for Education and Training of Work Staff ........................................ 256
 
6.4.1.4
 
Archeological Information Guideline ................................................................. 258
 
6.4.2
 
GENERAL GUIDELINE ON ENVIRONMENTAL MITIGATION AND 
PREVENTION MEASURES ............................................................................. 259
 

 


Yüklə 12,72 Mb.