16.4
CLEARANCES AROUND CRANE VESSEL
16.4.1
Where the crane vessel is moored adjacent
to an existing fixed platform, the following clearances
apply:
5 metres between any part of the crane vessel/crane and the fixed platform
or lifted structure for
the mooring system intact condition;
3 metres between any part of the crane vessel/crane and the fixed platform or lifted structure for
the condition of the mooring system with
the loss of one line;
10 metres between any anchor line and a live “hot” platform for the mooring system intact;
No contact between any anchor line and a live “hot” platform for the mooring system for the
condition of the mooring system
with the loss of one line;
5 metres between any anchor line and a shutdown “cold” platform for the mooring system intact;
For the one line failure condition of the mooring system with the
lifting vessel up against a
shutdown “cold” platform, contact of the anchor line with the platform structure
may be accepted
on a case by case evaluation.
16.4.2
Where the crane vessel is dynamically positioned in accordance with DP Class 2 or 3, a 10 metres
nominal clearance between any part of the crane vessel and the fixed platform shall be maintained.
This may be reduced in some cases to 5 metres as described in Section 13.6 of 0001/ND, Ref. [1].
16.4.3
There should be a minimum
under-keel clearance of 3 metres between crane vessel (including
thrusters) and seabed, for an offshore lift after taking
account of tidal conditions, vessel motions,
increased draft and changes in heel or trim during the lift. Lesser clearance for operations in sheltered
waters may be agreed with GL Noble Denton, depending on the seabed and environmental conditions,
but should not be less than 1 metre.
16.4.4
Clearances around the crane vessel either moored or dynamically positioned and any floating platform,
FPSO, drilling rig or submersible, shall be determined as special cases based on the station keeping
analysis of the floating structure and the lifting vessel. Positioning equipment and procedures shall be
defined to maintain the minimum clearances required for each specific operation.
The procedures
should minimise the durations for which these are required.