3. A standard machine fills paint cans at a rate of 1 gallon every 4 minutes. A
deluxe machine fills gallons of paint at twice the rate of a standard
machine. How many hours will it take a standard machine and a deluxe
machine, working together, to fill 135 gallons of paint?
(A)
1
(B)
1.5
(C)
2
(D)
2.5
(E)
3
4. Wendy can build a birdhouse in 15 hours and Miguel can build an identical
birdhouse in 10 hours. How many hours will it take Wendy and Miguel,
working together at their respective constant rates, to build a birdhouse?
(Assume that they can work on the same birdhouse without changing each
other’s work rate.)
(A)
5
(B)
6
(C)
7
(D)
8
(E)
9
5. Machine A, which produces 15 golf clubs per hour, fills a production lot in
6 hours. Machine B fills the same production lot in 1.5 hours. How many
golf clubs does machine B produce per hour?
golf clubs per hour
Davis drove from Amityville to Beteltown at 50 miles per hour, and
returned by the same route at 60 miles per hour.
6.
Dostları ilə paylaş: