Table 7.1 – Sand properties
-
Property
|
Natural, blended and manufactured sand
|
% by weight passing the 6.7 mm A.S. sieve
|
100
|
% by weight passing the 0.075 mm A.S. sieve
|
20 maximum
|
Plasticity index
|
10 maximum
|
Stabilised sand: 1 part either Type GP or Type GB cement to 12 parts sand (by volume) mixed with a minimum quantity of water sufficient to allow ease of placement and compaction.
7.5Execution
Compacted layer method of construction
This construction method applies to Class 3 material, excavated material, sand where puddling and jetting is not approved, dry stabilised sand, and dry lean mix concrete. Place and compact fill material uniformly in layers with loose layer thickness not exceeding 200 mm. Achieve the minimum relative compaction standards specified in Table 7.2 for Class 3 material, sand and excavated material.