❏
Check
global arrangement
❏
Verify depth of immersion
❏
Check
valve in openned position
❏
Cable is not tense (reserve for pipe elongation)
❏
Position vavle in open position
❏
Note
length of borehole pipe
❏
Verify water meter
❏
Note
length of cable
9 - Note here any additional control performed if any (low level water sensor test, level sensor in main tank …)
Name of commissioner :
Date :
Signature :
COMMISSIONING CHECKLIST
Check the case when control is done. Please note your remarks on the commissionning sheet.
CANADA
Action
contre la Faim
720 Bathurst St. - Suite 500
Toronto, ON - M5S 2R4
www.actioncontrelafaim.ca
FRANCE
Action contre la Faim
14-16
boulevard de Douaumont
75017 Paris
www.actioncontrelafaim.org
SPAIN
Acciόn Contra el Hambre
C/ Duque de Sevilla, 3
28002
Madrid
www.accioncontraelhambre.org
UNITED KINGDOM
Action Against Hunger
First Floor,
Rear Premises, 161-163
Greenwich
High Road,
London, SE10 8JA
www.actionagainsthunger.org.uk
UNITED STATES
Action Against Hunger
One Whitehall Street 2F
New York,
NY 10004
www.actionagainsthunger.org
FOR FOOD.
FOR WATER.
FOR HEALTH.
FOR NUTRITION.
FOR KNOWLEDGE.
FOR KIDS.
FOR COMMUNITIES.
FOR EVERYONE.
FOR REAL.
FOR ACTION.
AGAINST HUNGER.