O‘zbekiston respublikasi oliy va o‘rta maxsus ta’lim vazirligi a. U. Samadov, D. B. Xoliqulov. M. S. Saidova


CHAPTER 5. Iron alloy production and raw material requirement



Yüklə 7,77 Mb.
Pdf görüntüsü
səhifə9/119
tarix20.11.2023
ölçüsü7,77 Mb.
#163018
1   ...   5   6   7   8   9   10   11   12   ...   119
64e07299cd869 Металлар рец (1)

CHAPTER 5. Iron alloy production and raw material requirement. 
Recycling of scrap and metal waste in different smelters 
111 
5.1. Production of iron alloys from scrap and waste…………………. 
111 
5.2. Iron waste requirement, sources of scrap and iron waste and 
characteristics of processing units…………………………………….. 
118 
5.3. Processing of secondary scrap and cast iron wastes in a varnish 
furnace………………………………………………………………….. 
121 
5.4. Melting scrap and steel and iron waste in electric furnaces……… 
128 
5.5. Recycling of steel waste and production of secondary steel……. 
133 
5.6. Extraction of tin from iron scrap and zinc from dust……………… 
137 
CHAPTER 6. Recycling of scrap and non-ferrous metal wastes 
144 
6.1. Characterization and classification of scrap and waste aluminium and 
copper………………………………………………………………. 
144 
6.1.2. Preparation for recycling of scrap and aluminium waste and use of 
furnaces for remeltingaluminium waste……………………………. 
150 
6.1.3. Recycling of scrap and aluminium waste in reflection and electric 
furnaces…………………………………………………………………. 
154 
6.2. Main stages of processing of copper scrap and waste…………… 
161 
6.2.1. Melting of scrap and copper waste in mine furnaces………….. 
165 
6.2.2. Conversion and refining of blister copper obtained during waste 
treatment………………………………………………………………… 
168 
6.2.3. Dissolution of scrap and copper waste in sulfuric acid and ammonia 
solution………………………………………………………. 
174 
6.2.4. Electrochemical dissolution of scrap and copper waste……….. 
177 
6.3. Recycling of scrap and lead waste in reflection and electric furnaces 
182 
6.4. Recycling of nickel and cobalt scrap and waste………………… 
185 
6.5. Characterization and classification of scrap and waste based on gold, 
silver and platinum………………………………………………. 
190 
6.5.1. Processing of raw material wastes containing precious metals… 
193 
6.5.2. Determination of the amount of valuable metals in the raw material 


12 
composition…………………………………………………… 
200 

Yüklə 7,77 Mb.

Dostları ilə paylaş:
1   ...   5   6   7   8   9   10   11   12   ...   119




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin