Electrical design and installation of solar pumps


❏ Check global arrangement ❏



Yüklə 1,99 Mb.
Pdf görüntüsü
səhifə37/37
tarix25.09.2023
ölçüsü1,99 Mb.
#148570
1   ...   29   30   31   32   33   34   35   36   37
acf solar pumping electrical design and installation of solar pumps guidelines 2020


Check global arrangement

Verify depth of immersion

Check valve in openned position

Cable is not tense (reserve for pipe elongation)

Position vavle in open position

Note length of borehole pipe

Verify water meter

Note length of cable
9 - Note here any additional control performed if any (low level water sensor test, level sensor in main tank …)
Name of commissioner :
Date :
Signature :
COMMISSIONING CHECKLIST
Check the case when control is done. Please note your remarks on the commissionning sheet.


38
SOLAR PUMPING
Guidelines - Electrical design and installation of solar pumps
NOTES



CANADA
Action contre la Faim 
720 Bathurst St. - Suite 500
Toronto, ON - M5S 2R4
www.actioncontrelafaim.ca
FRANCE
Action contre la Faim 
14-16 boulevard de Douaumont
75017 Paris
www.actioncontrelafaim.org
SPAIN
Acciόn Contra el Hambre
C/ Duque de Sevilla, 3
28002 Madrid
www.accioncontraelhambre.org
UNITED KINGDOM
Action Against Hunger 
First Floor,
Rear Premises, 161-163 
Greenwich High Road,
London, SE10 8JA
www.actionagainsthunger.org.uk
UNITED STATES
Action Against Hunger 
One Whitehall Street 2F
New York,
NY 10004
www.actionagainsthunger.org
FOR FOOD.
FOR WATER.
FOR HEALTH.
FOR NUTRITION.
FOR KNOWLEDGE.
FOR KIDS.
FOR COMMUNITIES.
FOR EVERYONE.
FOR REAL.
FOR ACTION.
AGAINST HUNGER.

Yüklə 1,99 Mb.

Dostları ilə paylaş:
1   ...   29   30   31   32   33   34   35   36   37




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin