btec-international-level-3-it-specification

B2
Selecting appropriate 
test methodologies 
B3
Test plan 
B4
Product testing
 
A portfolio of evidence 
from testing a software 
product. The evidence 
should include an overview 
of testing tools used, why 
the methodology was 
chosen, test plans and the 
results of product testing. 

Review and present the 
results from software 
tests to meet a client’s 
needs and suggest 
improvements 
C1
Test evaluation and 
presentation of results 
C2
Test plan 
improvements
 
A written summative 
report on the testing 
carried out and the results 
of the testing. Statistical 
analysis on time taken to 
test bugs and pass/fail/skip 
rates. Additions to test 
plan, to include newly 
found bugs that were not 
initially considered in the 
preparation stage. 


U
NIT 
13:
S
OFTWARE 
T
ESTING
Pearson BTEC International Level 3 Qualifications in Information Technology –
Specification – Issue 3 – September 2022 © Pearson Education Limited 2022 
185 
Content 
Learning aim A: Understand the software development and testing 
methodologies commonly used during the development life cycle to quality 
assure software 
A1 User requirements and typical software project job roles 
The user requirements and typical project job roles in software development projects. 

User requirements, e.g. functions the software needs to perform, problems 
with a current system or a process that needs to be improved. 

Typical job roles in a software development team, including: 
o
software developers – design and build computer programs to solve problems 
o
testers – ensure functionality and uncover potential problem areas for the user 
o
business analysts – provide a communication point of contact between the 
development team and project manager 
o
project managers – ensure the smooth and effective running of a project’s 
development and its resources (people, finances and infrastructure) 
o
product owners – stakeholders in a project, take responsibility for a project
and promote it throughout the organisation. 

Yüklə 2,75 Mb.

Dostları ilə paylaş:
1   ...   165   166   167   168   169   170   171   172   ...   350




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin