0027-nd rev 11.2 8-jul-16 guidelines for marine lifting and lowering operations

GUIDELINES
 
FOR
 
MARINE
 
LIFTING
 
&
 
LOWERING
 
OPERATIONS 
0027/ND Rev 11 
 
Page 37 of 84 
9.5.2 
Elasticity and performance of fibre ropes used in a deployment system shall be provided by the 
manufacturer and be based on performance tests. The results of these tests shall be included in lift 
and lowering analyses. 
9.5.3 
The system shall be demonstrated to be adequate by load and function testing. 
9.5.4 
Certification for fibre ropes and the deployment systems shall be issued by an IACS member or other 
recognised certification body accepted by GL Noble Denton. For applicable IACS members, see IACS 
web site given below:
http://www.iacs.org.uk/explained/members.aspx 
9.5.5 
Some systems/cranes use a combination of wire rope and fibre rope. Where fibre ropes or slings are 
attached to wire rope, the installation procedure shall clearly specify how these attachments are made. 
11 


GUIDELINES
 
FOR
 
MARINE
 
LIFTING
 
&
 
LOWERING
 
OPERATIONS 
0027/ND Rev 11 
 
Page 38 of 84 
10 
THE CRANE AND INSTALLATION VESSEL 
10.1 
INTRODUCTION 
10.1.1 
The following sections define the checks required for the crane and installation vessel to demonstrate 
that it is suitable for the lifting operation.
10.1.2 
Operational aspects relating to the crane and installation vessel are also provided in this section with 
additional general requirements given in Section 18 and, for subsea installations, in Section 18.1.8. 

Yüklə 1,31 Mb.

Dostları ilə paylaş:
1   ...   37   38   39   40   41   42   43   44   ...   97




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin