10.5
INSTALLATION VESSEL
10.5.1
Installation vessels shall be capable of performing their intended functions within the seastates
predicted for the job. The vessel deck layout shall be adequate for
the equipment and provide
sufficient clear personnel access ways.
10.5.2
In some cases it is likely that the structure will be loaded at an inshore location.
In this case there must
be adequate clearances around the structure when considering lifting operations, vessel movements
and structure movements.
10.5.3
Some or all of the documentation and certificates in Section 6.6 of 0001/ND, Ref. [1] will be required,
depending on the location of the operations and local regulations.