Microsoft Word 16 Positive Isolation finalfeb 13. docx



Yüklə 248,11 Kb.
Pdf görüntüsü
səhifə1/14
tarix29.04.2022
ölçüsü248,11 Kb.
#56692
  1   2   3   4   5   6   7   8   9   ...   14
positive-isolation



Rev Date:  March 2015 

Page 1 of 8 



This document is uncontrolled when printed.

 

 



POSITIVE ISOLATION 

ALL‐HSE‐PRC‐181



 

Retention Code: 

CG01 ‐ CA 

Revised: March 2015 

Owner: 

HSE Performance Assurance 

Approved By: 

Manager, HSE Performance Assurance 

Effective: 

June 2015

 

Review Frequency: 

Five years or less 

Table of Contents 

Page 

1.0  Purpose .......................................................................................................................................................... 2 

2.0  Hazards to Mitigate ........................................................................................................................................ 2 

3.0  Procedure‐Specific Roles and Responsibilities ................................................................................................. 2 

3.1.  Supervisors ................................................................................................................................................... 2 

3.2.  Worksite Supervisors/Worker in Charge ...................................................................................................... 2 

3.3.  Workers ........................................................................................................................................................ 3 

3.4.  Engineering ................................................................................................................................................... 3 

4.0  Procedure ....................................................................................................................................................... 3 

4.1.  Additional Equipment Required ................................................................................................................... 3 

4.1.1.  Additional Personal Protective Equipment (PPE) ............................................................................ 3 

4.1.2.  Additional Equipment ...................................................................................................................... 3 

4.2.  Blanking and Blinding ................................................................................................................................... 4 

4.3.  Double Block and Bleed ................................................................................................................................ 4 

4.4.  Alternative Isolation Methods ...................................................................................................................... 5 

4.4.1.  Single Valve Isolation ....................................................................................................................... 5 



5.0  Document Retention ...................................................................................................................................... 6 

Appendix A – Definitions ......................................................................................................................................... 7 

Appendix B – Revision Record ................................................................................................................................. 8 

 

 




 

POSITIVE ISOLATION

 

 

Rev Date:  March 2015 



Page 2 of 8 


Yüklə 248,11 Kb.

Dostları ilə paylaş:
  1   2   3   4   5   6   7   8   9   ...   14




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin