2.4CCTV Inspection


Existing enclosed stormwater drains

Where the new trench or service passes an existing stormwater pipe (either vertically or horizontally) within a distance equal to diameter of the existing stormwater pipe or 0.5m, whichever is greater, pipe surveys are required to determine the condition of existing enclosed stormwater drains at the pre- and post-construction stages. The applicant must submit both a hardcopy report and a video display of the pre- and post-construction closed circuit television camera (CCTV) inspections.

The CCTV inspection report and video must be viewed by a Registered Professional Engineer, Queensland (RPEQ) prior to submission to Council. Any additional defects should be identified and remedial measures recommended by the RPEQ. Remedial measures for all additional defects must be submitted to Council for approval. Once the remedial measures have been completed, a follow up survey is required to demonstrate that they have been carried out to Council’s satisfaction.

New enclosed stormwater drains

Undertake closed circuit television camera (CCTV) inspection of new enclosed stormwater drains to demonstrate that the pipes have not sustained any premature cracking during installation.



Yüklə 73,69 Kb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   32




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin