Btec international level 3 it specification


Learning aim B: Carry out a project initiation for an IT project



Yüklə 2,75 Mb.
Pdf görüntüsü
səhifə116/350
tarix17.10.2023
ölçüsü2,75 Mb.
#156471
1   ...   112   113   114   115   116   117   118   119   ...   350
btec-international-level-3-it-specification

Learning aim B: Carry out a project initiation for an IT project 
B1 Project idea generation and solution creation 
Identification of a suitable problem, perhaps based on a given theme, and creation of 
alternative solutions, including: 

researching a given project theme or initial idea and identifying problems to be 
solved, using tools, e.g. the internet, journals, databases, libraries, publicly 
available company information 

creativity tools to solve problems, e.g. rewording problems, challenging 
assumptions, thinking in reverse, mind mapping, drawing a diagram, group 
discussion, brainstorming and Edward De Bono’s Six Thinking Hats
®

a specification that scopes out the alternative technical solutions, including: 
o
graphic solutions, e.g. sketches, diagrams, photographs and storyboards 
o
an outline of the required processes, e.g. information, systems, assemblies,
high-level flow chart 
o
an outline of costings, e.g. spreadsheet, material cost, budgets 
o
initial technical information, e.g. outline performance parameters. 
B2 Feasibility study 
A study into the feasibility of the project, identifying the resources and skills required to 
produce the IT product, service or system, and ensure it is economically viable. 

Technical assessment, including assessing and evaluating the technical 
resources available. 

Economic assessment, including assessing the cost, benefits and viability of the 
project. 

Legal assessment, including assessing the current and relevant local legal 
requirements. 

Operational assessment, including the assessment of how well the proposed 
solution meets the requirements and solves the problems of the project. 


U
NIT 
9:
IT
P
ROJECT 
M
ANAGEMENT
Pearson BTEC International Level 3 Qualifications in Information Technology –
Specification – Issue 3 – September 2022 © Pearson Education Limited 2022 
129 

Scheduling assessment, including the assessment of the likelihood of the 
project being a success, estimating the time required to complete the project. 

Sustainability assessment depending on the product or service proposed,
e.g. environmental impact, waste material, power usage, choice of material,
recycling and reuse. 

Security assessment, e.g. analysis of secure servers, software source control,
‘penetration’ testing. 

Usability assessment, e.g. the appropriate design of user interfaces ensuring 
smooth and consistent integration with any required systems. 

Yüklə 2,75 Mb.

Dostları ilə paylaş:
1   ...   112   113   114   115   116   117   118   119   ...   350




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin