U
NIT
9:
IT
P
ROJECT
M
ANAGEMENT
Pearson BTEC International Level 3 Qualifications in Information Technology –
Specification – Issue 3 – September 2022 © Pearson Education Limited 2022
129
•
Scheduling assessment, including the assessment of the likelihood of the
project being a success, estimating the time required to complete the project.
•
Sustainability assessment depending on the product or service proposed,
e.g. environmental impact, waste material, power usage,
choice of material,
recycling and reuse.
•
Security assessment, e.g. analysis of secure servers, software source control,
‘penetration’ testing.
•
Usability assessment, e.g. the appropriate design of user interfaces ensuring
smooth and consistent integration with any required systems.
Dostları ilə paylaş: