7
crobriefing
on Power Blackout Risks
The dena grid study concludes that for Germany alone an additional 3,600 kilometres of 380 kilovolt lines will
be required by 2020. For comparison, since 2005 just 80 km of new power grids were erected.
For the European Union grids investments of EUR 23-28 bn are needed over the next five years. This could only
be realised if investment and permitting processes are pushed and financing incentives
for TSOs are supported
by the EU members, regulator bodies and industry.
Worldwide an investment of USD 13.6 trillion will be required by 2030 in order
to meet increasing demand
(International Energy Agency, IEA). IEA concludes that 50% of this amount needs to
be invested in transmission
and distribution and another 50% in generation of electricity.
One of the most prominent projects that address these requirements is the Desertec project. The below chart
highlights the necessity of long distance transmission capabilities in order to efficiently use and distribute
renewable energies.
Source: Desertec Foundation
CSP:
Concentrated Solar Power
Squares indicate the area required to meet the respective power demand
DESERTEC-EUMENA
Concentrating
Solar Power
Hydro
Photovoltaics
Biomass
Wind
Geothermal
8
3.2. Historical power blackout
events and future scenarios
Dostları ilə paylaş: