PLC-4

Ladder Diagram to obtain output Latching and Unlatching in Allen Bradley
Ladder Diagram to obtain output Latching and Unlatching in Omron
Program Description

first figure shows how programming of Latching and Unlatching is done in Allen Bradley PLCs and 2nd
shows how Latching and Unlatching is done in Omron PLCs.

Siemens PLCs and Allen Bradley have similar instruction types. The only difference is that Latch is replaced
by Set and Unlatch is replaced by Reset. Addressing varies as well.

In first figure, when SW1 is pressed momentarily, the Output goes True even if the input from SW1 is
withdrawn, this happens because whenever the input SW1 is pressed, O:2/0 stores the bit and output remains
True even if from Switch SW1 is withdrawn.

This output goes False only when the switch SW2 is pressed resetting the O:2/0 bit which Unlatches the
Output.

In 2nd figure, as we can see, Omron PLCs use KEEP instruction which is a single rung instruction
comprising of two different inputs, one to set the bit and other to reset the bit. Latching and Unlatching is here
done by KEEPing the bit and accordingly Output is Latched and Unlatched.
Runtime Test Cases


PLC Program to Operate Seven Segment Display
This is a PLC Program to Operate Seven Segment Display.
Problem Description
Implement displaying 0-9 digits in 7 Segment LED Display interfacing with PLC using Ladder Diagram
programming language.
Problem Solution

7 Segment LED Displays are also known as BCD to 7 Segment decoder.

These displays are readily available or can be made easily organizing simple LEDs in the same structure as
in actual display.

Input to this display is BCD number which are decoded into digits 0 to 9.

Connect this display with Output card of a PLC.

Write a truth table to energize various outputs according to BCD input applied.

This displays do not come with internal latches, we can latch inputs in PLC using either seal in contact or
Latch-Unlatch instructions in Allen Bradley and Set-Reset instructions in Siemens PLCs.

Use K-Map to obtain output equations.

Implement this equations in Ladder Diagram format using AND and OR operations.

Yüklə 2,74 Mb.

Dostları ilə paylaş:
1   ...   84   85   86   87   88   89   90   91   ...   98




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin