The values that you see in the Risk Matrix are determined by various records. The baseline GE Digital APM
database contains a Risk Matrix that you can use when evaluating risk, but if you do not want to use the
baseline values, an administrative user can customize the default Risk Matrix or create a new Risk Matrix.
The following image displays the Risk Matrix that is provided in the baseline database, where no risk
values have yet been specified.
Each tab in the Risk Matrix represents an area that might be affected if risk were to be presented. The
Safety, Environment, and Operations tab each contains its own matrix, which combines in a grid format
probability factors with consequence factors. The Financial tab contains text boxes that serve the same
purpose.
Depending on how you access the
Risk Assessment window, the risk matrix will represent either
mitigated or unmitigated risk:
• If you have accessed the Risk Assessment window from a record that represents risk before any
actions have mitigated it (for example, a Failure Risk record in ASM or a Failure Effect node in an RCM
Analysis), the specified risk values in each matrix are represented by a
icon.
• If you have accessed the
Risk Assessment window from a record that represents an action that
might mitigate risk (for example, an Action record in ASM or a Recommendation node in an RCM
Analysis), the previously specified unmitigated risk values are represented by a
icon and the
mitigated risk values are represented by a
icon.
When a risk value is selected, the number on the corresponding tab is updated to indicate the specified
risk.
In addition, the cumulative values specified in the risk matrix are used in a calculation to determine the
overall risk rank, which is displayed in either the Mitigated Risk Rank or Unmitigated Risk Rank section
on the right side of the window.