Item
Description
Notes
Mitigated Risk Rank section
Displays a value that is calculated based
on the sum of the mitigated risk values,
which are represented by a
icon in
the matrix.
For a given risk, the mitigated risk rank
will be lower than the unmitigated risk
rank.
The value in the Mitigated Risk Rank
section is a sum of all of the values on the
tabs on the Risk Matrix, multiplied by the
appropriate weight and protection level
factor (the weight and the protection
level factor are configured in Risk
Category records and Protection Level
records).
If the Risk Matrix is configured to use the
maximum risk rank, this value is the
greatest of all the risk values, not the
sum.
An administrative user can modify the
label of this section using the Risk Matrix
datasheet.
Risk Matrix
Contains a series of tabs that contain a
matrix, where you can make selections
that the GE Digital APM system will use to
calculate the overall risk rank.
For details about the Risk Matrix, see the
topic
About the Risk Matrix
.
Legend
Displays the icons that are used to
represent mitigated risk values and
unmitigated risk values in the matrix.
None
Dostları ilə paylaş: |