router, after that the domain name will hold the public IP of
user router even if it changed (dynamic IP).
III. R
ESULTS
After completing the prescribed
work and make sure of
the
correct
execution
in
acceptable
time.
The
implementation is divided into several parts:
The first part was building the control systems
(Hardware implementation and Fuzzy controller), the
execution of the fuzzy controllers and managed the control
systems was completely inside the microcontroller. The next
section will present some result
of an experiment on the
control systems. The results of the cooling/heating system
are depicted in Fig. 14.
The set-point is 25° C and the starting temperature is 35°
C. The case here is cooling, then put the appropriate polarity
on the terminals of the Peltier, then output the PWM signal
on Mosfet 640N to control the amount of current in result
control on the heating produced
and reaches the desired
temperature in acceptable time.
The result in Fig. 15 shows the response of the irrigation
control system. The result in Fig. 16 illustrates the response
of the system and how the system reaches the desired
brightness degree in specific time.
Fig. 14 Set-Point is 25° and the initial value is 35°
Fig. 15 The set-point is 0.5 and system response.
Fig. 16 the system response of light system control.
The second part was making the system able to
download the
set-points from the website; this could be
accomplished by utilizing the microcontroller plus Ethernet
shield. The third part provided a feature of upload the
system’s data on the website. Also,
this function used the
microcontroller and the Ethernet shield. Then should collect
all the parts in one system, and employ a principle of
execution technique to
ensure high-performance and
efficient system and no conflict in execution that may lead
to deadlock. Fig. 17 had shown the entire result of the
system.
As illustrated in Fig. 17, the
system starts to work by
downloading the set-points from the web application. After
that, operate the cooling/heating system, the irrigation
system, and the lighting system depending on the set-points.
Finally, upload the readout
of the sensor to the web
application.
In order to calculate the system sampling time, each
system should be determined individually. The temperature
control system, irrigation control system, and light intensity
control system are take 308, 259, and 115 msec respectively
as shown in Fig. 17.
While, the IoT could be determined according the results
that depicted in Table 1.
Fig. 17 The entire performance of the system.
TABLE1 T
HE
I
O
T’
S
T
IME CALCULATIONS