PLC-4

Runtime Test Cases
Inputs
Outputs
Physical Elements
I:1/14 = 1
O:2/0 = 1
Start separation process
I:1/0 = 1
O:2/1 = 1
Energize solenoid gate
T4:0/DN = 1
O:2/1 = 0
De-energize solenoid gate
PLC Program to Control Spray-Painting of Parts
This is a PLC Program to Control Spray-Painting of Parts.
Problem Description
Control Spray-Painting operation in PLC using Ladder Diagram programming language.
Problem Diagram
Problem Solution

Spray-Paining operation is similar to the bottle capping operation. The only difference is that Bottle Capping
operation used timers while Spray-Paining operation do not require timers.

Two limit switches are used, one to detect hangers and other to detect parts.

Both are mounted exactly opposite to each other so that when part is not present, outputs are complement
of each other.



Bit shift register is used to spray parts.

Oven is used to dry the parts after they are sprayed. This output is continuously ON and is not controlled.
PLC Program
Here is PLC program to Control Spray-Painting of Parts, along with program explanation and run time test
cases.
List of Inputs and Outputs
I:1/14 = Start
(Input)
I:1/15 = Stop
(Input)
I:1/0
= Limit switch (Hanger)
(Input)
I:1/1
= Proximity (Part detection)
(Input)
O:2/0
= Master coil / Run
(Output)
O:2/1
= Oven
(Output)
O:2/2
= Spray
(Output)
BSL
= Bit shift left instruction
(Logical)
B3:0
= Bit shift Register
(Register)
B3:0/2 = Bit to energize capping machine (Bit)
R6:0
= Control register
(Register)

Yüklə 2,74 Mb.

Dostları ilə paylaş:
1   ...   6   7   8   9   10   11   12   13   ...   98




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin