Problem Description



Yüklə 2,74 Mb.
Pdf görüntüsü
səhifə50/98
tarix23.07.2023
ölçüsü2,74 Mb.
#137216
1   ...   46   47   48   49   50   51   52   53   ...   98
PLC-4

Problem Diagram


Problem Solution

Use limit switches, control valves and motor agitators separately for all three mixing tanks.

The only common input to all these tanks is Material feeding by two valves.

Use separate timers for each tank for mixing.

First two tanks are tagged as primary mixing tanks and the third one is said to be secondary mixing tank.

Use switches of stop buttons of both Primary mixing processes as an input to start the tank third to enter into
the process sequence.
PLC Program


Here is PLC program to Control Three Mixing Devices in a Processing Line, along with program
explanation and run time test cases.
List of Inputs and Outputs
I:1/14
= Start 
(Input)
I:1/15
= Stop
(Input)
O:2/15
= Master Coil
(Output)
I:1/0, I:1/5, I:1/7
= Level of Material B Switches
(Input)
I:1/1, I:1/4, I:1/8
= Level of Material A switches
(Input)
I:1/2, I:1/3, I:1/6
= Low Level Switch (empty tank)
(Input)
O:2/0, O:2/4, O:2/8
= Inlet Valves to feed Material A (Output)
O:2/1, O:2/5, O:2/10
= Inlet Valves to feed Material B (Output)
O:2/2, O:2/6, O:2/9
= Agitator Motors M1, M2 and M3
(Output)
O:2/3, O:2/7, O:2/11
= Outlet Valves for product outlet
(Output)
T4:0, T4:1, T4:2
= Timers to mix materials
(Timer)


Ladder
 
Diagram
 
for
 
Mixing
 
Tank
 
1



Yüklə 2,74 Mb.

Dostları ilə paylaş:
1   ...   46   47   48   49   50   51   52   53   ...   98




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin